Material: Sandwich Panel
Usage: Dormitories, Temporary Offices, Camp, School, Hospital, Toilet
Certification: ISO, CE
Customized: Customized
Wall Panel: PU or Rock Wool Sandwich Panel
Insulation: Rock Wool or PU or Specially Required
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KHCD
Window
PVC Window or Aluminum
Floor
MGO Board or Cement Board
Fire Proof
A Grade
Life Span
15~20 Years
Connection
Bolts
Transport Package
Load Into 40FT Container with Proper Packing
Specification
3000*5950*2800mm or Customized
Trademark
K-HOME
Origin
Henan, China
HS Code
9406000090
Production Capacity
1000/Month

Product Description

Fast Assemble Low Cost Prefab Living Quarters for Mines Worker Camp

Fast Assemble Work sites in the mining, mineral exploration, oil and gas, construction, natural resources, and research industries are often located in remote areas that tend to have harsh climates and less than optimum conditions. Such work sites tend to be geographically isolated, and not easily accessed by road - often requiring days of travel and using a number of methods to transport equipment, materials, supplies, and personnel.
Whether it is a small mineral exploration team scouting potential sites for future mining projects, or the establishment of a man camp for oil field operations, projects in these locations can be designed to operate for short periods of time (days, weeks, or months) and require a high degree of portability for establishing permanent workforce accommodations and on-site infrastructure to support full-time production efforts lasting years or decades.


For some remote areas, workers' daily life needs to be guaranteed, and after the project ends, the houses are no longer needed.
If you built concrete buildings,
Disadvantage:1. The cost is high;
2. The installation time is long;
3. The complicated demolition work.
So concrete buildings are not suitable for work in these remote areas.

But for our fast-assembling temporary container,
Advantages:
1. Low cost and quick installation;
2. After the project is completed, it can be moved from this place as a whole without disassembling to the next project location.
3. Can be flexibel combined according to your actual needs.
So our container houses are the best choice for you and being loved by more and more customers.
Fast Assemble Low Cost Prefab Living Quarters for Mines Worker Camp
Fast Assemble Low Cost Prefab Living Quarters for Mines Worker Camp
Parts of Our Container House
Item Specification Pictures
Part 1: Roof System (roof plate + roof purlin + roof insulation + ceiling)
1 Roof Plate Roof tile is 0.5 mm thickness steel sheet;
Pre-coated and color coated;
2 Roof Purlin 1pc 40x80mm Galvanized Square tube + 2pcs 40x60mm Galvanized Square tube + 5pcs 40x80mm Galvanized Square tube;
3 Roof Insulation 50 mm glass wool insulation material;

4
Ceiling Ceiling is 0.4 mm thickness shaped steel plate;
Pre-coated and color coated;
Part 2: Steel Frame (Corner column + column + beam + bolt)
1 Corner Joint Material: 4 mm Thickness Shaped Steel,   surface spray treated by machine after repeatedly polished;
Size: 160* 160* 160 mm (Bottom)
&160* 160* 180 mm (Top);
2 Column Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished; 

Size: 160* 160* 2480mm;
3 Top and Floor Long Beam Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;
Size: 5680* 60* 160 mm;
4 Top & Floor Short Beam Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;
Size: 2680* 60* 160 mm;
5 Bolt High strength galvanized steel bolt;
To fix the Corner Connection Part and beam, Corner Connection Part and column;
Part 3: Floor System (Floor structure + floor panel + floor leather)+Wall Panel
1 Floor Purlin Material: 10pcs 40x80mm Galvanized Square tube + 4pcs 40x80mm Galvanized Square tube + 2pcs 30x50mm Galvanized Square tube;
2 Floor Panel 18 mm MGO board
3 Wall Panel 50 mm rock wool sandwich Panel;
Outside color is light silver gray (0.38mm thickness steel );
Inside is white color steel (0.38mm thickness steel ).
Part 4: Drainage system (Top drainage channel + drain pipe)
1 Drain pipe and water gutter Water drain pipe:
Diameter: 50mm
Length: 2700mm;
Water drain channel: 90(W)x50(H)mm;
Part 5 : Door & window system
1 Standard Door Size: 930mm*2000mm
Material: sandwich panel/steel door;
2 Window Size: 930mm*1200mm
Plastic steel single glass sliding window (including screens) With 0.35mm Double glass and strength pvc window frame/Glass Window;
Window rail is smooth.
Part 6: Electricity System
1 Lamp Type: LED energy saving lamp;
Power: 24W
Include: Two sockets and one switch;
Note: The socket will be equipped according to the local standard.
Includes: electric wire and conduit;
Use: The electric wire will be in the conduit and go through the wall panel for concealed installation.
2 Socket & Switch
3 Electric Wire
4 Air Circuit Breaker
Part 7: Internal Decoration
1 Internal skirting line Material: PVC;
Includes: Vertical internal corner and horizontal internal corner.
2 Steel Plate for Internal Connection Material: Stainless Steel;
Used on the joints between two bottom frames when different containers connected with each other.
3 Floor Leather Material: PVC
Thickness: 1.6mm
Features: moisture proof; wear resisting;
anti-corrosive and thermal insulation.
Part 8: Installation Accessories
1 Sealant Used for the joints of doors and windows for better waterproof.
2 Structure Adhesive Used for the reinforcement and seal of the steel frames.
3 Screws Include: rivets, bolts, drill tail screw;

Installation Steps
Fast Assemble Low Cost Prefab Living Quarters for Mines Worker Camp
Project Show
Fast Assemble Low Cost Prefab Living Quarters for Mines Worker Camp
Fast Assemble Low Cost Prefab Living Quarters for Mines Worker Camp

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now