• Modular Steel Structure Prefabricated Apartment
  • Modular Steel Structure Prefabricated Apartment
  • Modular Steel Structure Prefabricated Apartment
  • Modular Steel Structure Prefabricated Apartment
  • Modular Steel Structure Prefabricated Apartment
  • Modular Steel Structure Prefabricated Apartment

Modular Steel Structure Prefabricated Apartment

Material: Sandwich Panel
Lifespan: 25 Years
Connection: Screws, Bolts
Fireproof: A Grade
Installation Speed: One Week
Wall Material: Rock Wool Sandwich Panel
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KHCD
Steel Frame
4mm Thickness Steel Pillar 3mm Steel
Wall Panel
60mm EPS/Rockwool/PU Sandwich Panel
Door
Steel Door/Sandwich Panel Door
Usage
Villa, Dormitories, Temporary Offices, Camp, Accommodation, Office, Toilet
Certification
ISO, CE, SGS
Customized
Customized
Transport Package
20FT/40FT Shipping Container
Specification
20ft/40ft
Trademark
K-HOME
Origin
Henan, China
HS Code
9406000090
Production Capacity
5000 PCS/Month

Product Description

Modular Steel Structure Prefabricated Apartment

Do you have a building project? Do you have questions about  a new home?
We specialize in everything steel and we would like the opportunity to speak with you, and discuss what our buildings can offer you. We have many affordable options for various sized, new buildings that we have in storage and ready for delivery.


The cost of apartment development, leasing, and rents are rising. More and more people are seeking apartment lease agreements for mortgage loans. As the housing market has shown a growing trend in the past few years, apartment development, leasing and rents continue to significantly maintain the dominant position of real estate.
Those seeking to develop apartment buildings should consider Luxury Comfortable Portable Living Container House Cabin Apartment. This option not only provides you with the same standard and faster construction method as the traditional structure, but modular construction also allows you to build more units at less cost.
Perhaps most importantly, Luxury Comfortable Portable Living Container House Cabin Apartment is much faster than building from scratch. We assemble the units individually in the factory and then ship them to your work site for installation. The lead time is shorter, so the unit can be rented out faster, so you will see a faster return on investment.
Since there is very little on-site work, Luxury Comfortable Portable Living Container House Cabin Apartment will cause less disturbance to your site than traditional buildings-especially if you plan to add new buildings to an existing high-end residential building. Compared with the use of traditional on-site construction methods, the construction of prefabricated high-end houses has less interference to current residents. But even if your facility is brand new, you can minimize the construction work on-site to make your neighbors happy
.
Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment



Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment
Modular Steel Structure Prefabricated Apartment

FAQ?
Q: Are you a factory or trading company?
A: We are a real factory, we have 3 plants in Xinxiang City, Henan Province, China

Q: How about your production capacity?
A: Container House: 1000 sets per month.
     Prefab House: 40,000 square meters per week.

Q: How about your quality control?
A: We have got ISO9001:2015 and CE certificate Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.

Q: Is third-party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.

Q: How about your delivery time?
A: Generally within 15 days, it is according to the order quantity, partial shipment is allowed for big orders.

Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do a turnkey job for some kind of project.

Q: How to ensure the product you supply is what we want exactly?
A: Before placing an order, our sales and engineers team will provide you a suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished project photos are available, which will help you understand the solution we provided deeply.


For more information, please do not hesitate to contact us.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now