• Recycle Use Cheap Construction Site Pre-Engineer House
  • Recycle Use Cheap Construction Site Pre-Engineer House
  • Recycle Use Cheap Construction Site Pre-Engineer House
  • Recycle Use Cheap Construction Site Pre-Engineer House
  • Recycle Use Cheap Construction Site Pre-Engineer House
  • Recycle Use Cheap Construction Site Pre-Engineer House

Recycle Use Cheap Construction Site Pre-Engineer House

After-sales Service: 24 Hours Online Service
Warranty: 1 Years
Material: Steel Structure
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Wall Panel
EPS/Rockwool/PU Sandwich Panel
Color
Light Silver Gray or White or Customerized
Door
Steel Door/Sandwich Panel Door
Connection
Screws, Bolts
Transport Package
Load Into Sea Container
Specification
nM+160(n=4, 5, 6… )
Trademark
K-HOME
Origin
Henan, China
HS Code
9406000090
Production Capacity
1000 PCS/Month

Product Description

Prefabricated houses are generally used in construction site dormitories and disaster relief and other temporary government buildings for disaster victims. The prefabricated houses are processed by factories and assembled on-site to form houses. The base and roof, including the main frame, are basically made of steel. The structure is the main structure, which is fastened by bolts. The three performances of windproof, fireproof and waterproof are one of the important standards for testing the quality of a prefabricated house. Let's talk about the windproof performance of a prefabricated house. A house like a slab house does not need to lay the foundation. It can be assembled directly and placed on the ground. It can resist the eighth wind. This can also dispel most customers' concerns about the windproof performance of the prefab house. If the prefab house is placed The location sometimes hangs with strong winds. Although it can withstand the eighth wind, I still worry about what to do. If this is the case, you can build a few concrete piers on the pre-installed ground and fasten them with factory-configured bolts to make it stronger.
Recycle Use Cheap Construction Site Pre-Engineer HouseRecycle Use Cheap Construction Site Pre-Engineer House
Advantages of pre-engineered metal buildings over traditional ones:

Pre-engineered metal buildings offer a number of benefits over traditional brick and mortar construction. They are cost-effective, customized, offer design flexibility, and are built to last. These are the most common benefits of pre-engineered metal buildings.

Pre-engineered buildings are also sometimes referred to as prefab metal buildings. They are custom-designed structures that are made in factories and transported to the construction site for assembly and installation. The primary structure is made of steel with insulated sandwich panels or single-skin sheets for wall and roofing depending on the requirement. Accessories can also be added according to one's choice and building type.

So what makes PEB  ideal for your business? Let's look at a few advantages of PEBs as below:

Construction Site and Labor cost Savings: Pre-engineered buildings have a vendor manufacturing them. So there is a team of people involved right till the completion. The building components are accurately manufactured in the factory, so the construction effort required at the site is lesser compared to traditional construction. Thus, the requirement of labor and additional costs at the construction site is minimized.

Lower Heating and Cooling Cost: The insulated wall panels retain room temperature. Therefore, you need not spend hefty amounts for cooling or heating.

Require much lesser maintenance: Steel has its inherent property of lasting long. Other than that, factors that normally affect conventional buildings like mold growth, mildew, termite do not affect steel. Therefore pre-engineered steel buildings require much lesser maintenance compared to traditional ones. Also, some PEBs use the Rockwool sandwich panel, which has fire-resistive capabilities, so they are less risky as well.

Cost-effective: Now that we have talked about low maintenance factors, the other benefit of the pre-engineered metal buildings is that they are easy to dismantle. So you can carry the components and rebuild them at another project location when required. This saves a lot of cost in the long run since you invest once and can reuse the same building multiple times.

Enables faster construction: A pre-engineered building is constructed offsite, with all of its specifications being determined beforehand. After this, the structures are assembled are onsite. This process is about 50 percent faster than traditional construction. So, if you have needed your project to be done within a very short span of time, pre-engineered buildings, are the way to go.

Henan K-home Steel Structure Co., Ltd has over 20 years of experience in pre-engineered building construction. Our portfolio is diverse and includes large warehouses, factory buildings, industrial sheds, airport terminal buildings, prefab schools, stadium structures, etc.


Recycle Use Cheap Construction Site Pre-Engineer House


Recycle Use Cheap Construction Site Pre-Engineer House
Recycle Use Cheap Construction Site Pre-Engineer HouseRecycle Use Cheap Construction Site Pre-Engineer HouseRecycle Use Cheap Construction Site Pre-Engineer House
FAQ?
Q1. What products do you offer? 
A1. We focus on prefabricated houses, such as labor camp, container house, steel structure warehouse, modular villa for more than 12years. 

Q2. What is your payment term? 
A2. Our payment term: For standard products 30% deposite, the banlance should be paid before delivery. For Customized products, will depend on the design. 

Q3. What is your MOQ (minimum order quantity)? 
A3. For standard products, we don't have MOQ quantity. 

Q4. How is your after-sales service? 
A4.1. 24 hours available after-sales service. 
2. For the installation, we will offer installation drawing and videos, if any questions we can reply in time. We can also can send our engineer to guide local workers, but you have to charge the double ticket, accommodation, food and salary. 

Q5. What information should we offer before you quote? 
A5.1. You have the drawing, pls give us and tell us the material you use. 
2. If no drawing, pls tell us the usage and the size of the house, then we design for you with the good price. 

 









 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now