Prefabricated Modular Buildings for Schools
Contact Supplier
Product Highlights
- Customizable Design: Color, design, and materials can be customized according to customer requirements.
- Earthquake Resistance: Structure can resist 7-grade earthquakes and 100km/h winds for enhanced safety.
- Fast Installation: A team of 6 skilled persons can install 150 sq.m of house every day.
- Durable Lifespan: Built with high-quality materials ensuring a service life of more than 25 years.
- Certified Quality: Products hold CE and ISO9001 certifications for guaranteed quality standards.
- Versatile Usage: Suitable for dormitories, warehouses, villas, temporary offices, and workshops.
- Easy Transport: Components are easily assembled, disassembled, and transported to remote areas.
- Thermal Insulation: Options include PU, EPS, Rock Wool, or Glass Wool sandwich panels for insulation.
Product Attributes
- Customization
- Available
- Certification
- CE, ISO9001, ISO
- Customized Or Not
- Customized
- Model NO.
- kh-ph
- Material
- Sandwich Panel, Sandwich Panel
- Wall Material
- PU /EPS/Rock Wool Sandwich Panel
- Floor
- Vinyl Sheet on Plywood or Cement Board
- Window
- Aluminum Window, Double Glazing
- Door
- Aluminum Sandwich Panel
- Connection
- Screws, Bolts
- Insulation
- PU or Specially Required
- Color
- According to Customer
- Design
- According to Customer or by Ourself
- Fire Proof
- B Grade
- Life Span
- More Than 25 Years
- Usage
- Dormitories, Warehouse, Villa, Temporary Offices, Workshop
- Customized
- Customized
- Transport Package
- Load Into 40FT Container with Proper Packing
- Specification
- ISO
- Trademark
- K-HOME
- Origin
- Henan, China
- HS Code
- 94060000
- Production Capacity
- 500PCS/Month
Product Images of Prefabricated Modular Buildings for Schools
Find Similar Products
Product Description
![]()
* Resistance against water and fire * Withstand earthquakes and storms * Excellent resistance against Rust * Speedy Construction for hill Top * Easy to shift, perfect for remote area * No Heavy Foundation material used
![]()
1.Measure the size (inner width 5.46m), put the ground beam by expansion screw.
2.Install the column and floor beam.
3.Install the outside wall panel of the first floor, and Mgo plate and stairs of the second floor.
4.Install the purlin and surrounding beam.
5.Install the doors, windows, and roof panel.
1.Easily assemble and disassemble.
2.Conveniently Transport.
3.Simple terrain requirments, can be located in hillsides, hills, grasslands, deserts, riversides.
4.The K-Type prefab house is durable and stable, and also with good thermal insulation performance.
5.Its design can be customized, with exquisite and elegant appearance.
6.Most components of prefab house are completed in the factory, the site assembly is convenient and fast.
![]() Henan K-home Steel Structure Co.,Ltd is located in Xinxiang, Henan Province. It is a self operating private enterprise, established in the year of 2007,registered capital RMB 20 million, cover an area of 100,000.00 square meters with 260 employees. We are engaged in design, project budget, fabrication, installation of steel structure and sandwich panels with second-grade general contracting qualification. Our main products covered sandwich panels, OEM prefab house, container house, construction material, light steel structure house, light steel villa, non-standard design house, steel structure projects, and installation service.
We can offer you three type of insisting on the installation: 1.1 : We can offer you the manual include the photos and drawings, or some videos for help you on the installation. And you will organize the local people to install it. 93% of our clients finished their houses in this way. 1.2: We can send our people to your site to guide your people to install. Or send team people (3-5 people) to your site to install for you. This way is most easy way, but you need to pay their round-way tickets, local food, accommodation, transportation, communication and salary, and also their security on the site. Almost 5% of our clients choose this way. And in the normal we will require the order should be more than 100000USD. 1.3: You can send your people (engineers or the technician) to our company to study the installation details. 2% of our clients choose this way for their orders. 2. The advantage of the prefab house. 2.1 : Recycle using: you can assemble it in the site A, then disassemble and install again in the site B, then site C. In such way, there is no industrial rubbish after you finish the jobs in the site. 2.2 : Low cost. The steel structure is much lower on the cost then the tradition building. 2.3 : Quickly installation. In the normal, 6 skilled persons team can install 150 sq.m house every day. 2.4: safety: the prefab house can resistance 7 grade earthquake, and 100km/H wind. 3. The mainly use of the prefab house: In the normal it's mainly used as temporary building in the site, such as temporary office, labor accommodation, etc. And in the recent years, the prefab house is largely use in the resettlement housing in some disaster area. In 2008, it played a major role on the resettling the victims after the terrible earthquake on 12th, May, 2008. 4. How to maintain your prefab house? 4.1: First of all, when the prefab house is installed, it's better not to make any other changes, like an expansion, adding partitions or cutting down the walls, or removing screws, and so on. 4.2 : Made the re-paint every 1-2 years after you install it. Such way can increase its service life and keep beautiful. 4.3 : Finally, do not tie the wire to the prefab house, which will lead to the prefab house uneven force and easily cause electric shock accident. 5. How to prepare the foundation for the K style prefab house? In the normal we will offer you the foundation drawing to prepare the foundation. In the normal the K style house is the strip foundation. 6. How many flooring can the K style prefab house build? In the normal we will suggest you to do the K style prefab house in 1 floor or 2 floors. And the highest one is 3 floors if you need. And will suggest you not build the house more than 3 floors by K style house. If you want to build the house more than 3 floors you better choose the design of T house design supported by the H shape steel By the way, if you want to layout the toilet room in the K style prefab house, you'd better made it in the ground floor for the water proofing. 7. The materials option for the thermal insulation: We have 3 materials for your option: They are: EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, PU (polyurethane) sandwich panel. |
|||||||||||||||||||||||||||||||||||||||
About the Supplier
Company Profile
KHOME (Henan K-Home Steel Structure Co., Ltd. ) is a manufacturer and exporter of modular container houses and pre-engineered steel buildings (PEB), headquartered in Xinxiang, Henan Province, China. We began manufacturing in 2003 and entered international markets in 2015. With six specialized production bases, we manufacture detachable, flat-pack, folding, and expandable container houses, Apple Cabins, capsule houses, and pre-engineered steel buildings. We support overseas projects from design and custom manufacturing through quality inspection, logistics coordination, installation guidance, and after-sales service.
Our buildings are used in a wide range of projects, including construction site offices and accommodation, worker camps, mining camps, oil, gas, and energy project camps, infrastructure project camps, schools, warehouses, and supporting facilities such as kitchens and canteens. Our customers include construction contractors, mining and energy companies, project developers, and camp operators. We provide customized building solutions to meet different project requirements, with building specifications, shipping arrangements, and installation schedules planned around project timelines and site conditions.
To date, KHOME has exported building products to 72 countries and participated in more than 200 projects across Southeast Asia, the Middle East, Africa, the Americas, Europe, and other regions. We adjust building layouts, structural configurations, and material specifications to suit the climate, intended use, and site conditions of each project. Our designs follow Chinese national standards (GB), with structural calculations based on the wind, snow, seismic, and live loads applicable to the project location. When local building codes require compliance, clients may appoint a licensed local engineer to review the design, and we will revise the relevant drawings based on the review findings.
For international delivery, KHOME offers EXW (Ex Works), FOB (Free on Board) Qingdao Port, and CIF (Cost, Insurance and Freight) trade terms, coordinating export and shipping arrangements as agreed. Once an order is confirmed, we provide installation drawings and technical materials appropriate to the building system, including installation videos for standard units. Overseas on-site installation guidance can also be arranged according to project requirements and mutual agreement to assist the client's local construction team. Our quality management system is certified to ISO 9001: 2015, and our insulated panels are supported by third-party test reports. Steel frames, wall panels, and roof panels are covered by a one-year quality warranty starting from the date of shipment.
To discuss a potential project, please provide the project location, intended building use, approximate dimensions, and design load requirements. We will assess the project requirements, site conditions, and relevant technical specifications before confirming whether we can undertake the project and under what terms, prior to starting detailed design work.
About Our Factory & Business Background
- Address
- Room615,Xinghai Center Building,705 Renmin East Road, Hongqi District, Xinxiang, Henan, China
- Terms of Payment
- LC, T/T, PayPal, Western Union, Small-amount payment
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, DDP, EXW
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays - Nearest Port
- Tianjin & Qingdao
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2014-11-04
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- How to install the houses in the site?
- We offer three installation methods: 1. Manual installation with photos/videos (93% of clients). 2. Our team guides or installs on-site (5% of clients, requires order >$100,000). 3. Send your engineers to our company for training (2% of clients).
- What are the advantages of the prefab house?
- Advantages include: 1. Recyclable and reusable at different sites. 2. Low cost compared to traditional buildings. 3. Quick installation (150 sq.m/day with 6 people). 4. High safety, resisting 7-grade earthquakes and 100km/h winds.
- What is the main usage of the prefab house?
- It is mainly used as a temporary building on sites, such as temporary offices and labor accommodation. It is also widely used for resettlement housing in disaster areas.
- How to maintain your prefab house?
- 1. Avoid structural changes like adding partitions or removing screws after installation. 2. Repaint every 1-2 years to increase service life and maintain appearance. 3. Do not tie wires to the house to prevent uneven force and electric shock risks.
- How to prepare the foundation for the K style prefab house?
- We provide foundation drawings for preparation. The K style house typically uses a strip foundation.
- How many floors can the K style prefab house build?
- We suggest 1 or 2 floors. The maximum is 3 floors. For more than 3 floors, we recommend the T house design with H-shape steel support. Toilet rooms should be on the ground floor for waterproofing.
- What are the material options for thermal insulation?
- We offer three insulation material options: EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, and PU (polyurethane) sandwich panel.
Send your message to this supplier
People who viewed this also viewed
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
-
US$40.00-65.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Low Cost Prefabricated House
- Prefabricated Modular Buildings for Schools
Hot Searches
- Building Material Factories
- China Building Factories
- Building Glass Factories
- Building Plastic Factories
- Prefabricated House Building
- Modular House Building
- Prefabricated Modular House
- Modular Building Prefabricated Houses
- Prefab Modular Building House
- Prefabricated House Bulkbuy
