• Construction Site Temporary Steel Labor Camp
  • Construction Site Temporary Steel Labor Camp
  • Construction Site Temporary Steel Labor Camp
  • Construction Site Temporary Steel Labor Camp
  • Construction Site Temporary Steel Labor Camp
  • Construction Site Temporary Steel Labor Camp

Construction Site Temporary Steel Labor Camp

Material: Steel Structure
Usage: Warehouse, Dormitories, Temporary Offices, Workshop, School, Hospital, Toilet
Certification: ISO, CE, School, Hospital, Toilet
Customized: Customized
Transport Package: 20/40FT Shipping Container
Specification: 3000*6000*2800mm or Customized
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KHCD
Trademark
Khome
Origin
Henan, China
HS Code
9406900090
Production Capacity
8000sqm/Month

Product Description

Construction Site Temporary Steel Labor Camp 

Construction Site Temporary Steel Labor Camp is highly adaptable to the environment, easy to install on-site, and can be used for a temporary office, accommodation, integrated kitchen, bathroom, and other purposes required by the construction site.
The wall material of the container worker accommodation house is color steel sandwich panels, the outer layer is a high-strength color steel plate, and the inner layer is a lightweight insulation material polystyrene foam. The color steel plate is pressed by an automatic continuous forming machine and then glued with a high-strength adhesive. A new type of building material combined with lightweight, high mechanical strength, heat insulation, sound insulation, corrosion resistance, water vapor penetration and weather resistance, and other excellent properties.
Application of Construction Site Temporary Steel Labor Camp:
1. The high-end demand for temporary construction products at construction sites, such as the office of the project manager, accommodation, meeting rooms, etc.;
2. Due to site restrictions, the construction site can only install box-type modular house products;
3. Housing for field operations; such as field exploration and construction mobile office, dormitory, etc.;
4. Emergency rooms; such as military mobile command center, rescue mobile command center, disaster relief mobile command center, etc.
Construction Site Temporary Steel Labor CampConstruction Site Temporary Steel Labor Camp

Detail Specifications:

 

Roof System: Made of 4 parts: steel ceiling+roof purlins+glass wool insultion material+roo steel sheet.

There are also 4 big water gutters to store rainwater and flow naturally. And there are 4 drainpipes in each column,

so the rainwater will flow from the roof steel sheet, into the water gutters, at last flow from the drainpipes orderly.
Construction Site Temporary Steel Labor CampBottom System: Composed of purlins, fireproof MGO board and PVC floor leather.
Construction Site Temporary Steel Labor Camp

Wall Panel: Standard rockwool sandwich panel, it is fireproof. There are other options to choose.

According to your local environment, we can provide you a suitable solution.
Construction Site Temporary Steel Labor Camp

Steel Frame: Galvanized steel frame, the thickness is 2.3mm. It is very thick. Surface spray treated by machine after repeatedly polished.

So it is double protection.
Construction Site Temporary Steel Labor Camp

Door and Windows: 

Steel door, the interior of the door is filled with composite wood to make the door heavy and strong; It is fireproof;

PVC steel sliding double glass window, with screens and anti-thief bar.

Construction Site Temporary Steel Labor Camp

Accessories:

Electricity system, including light, switch, socket, air breaker and wires, these can meet your site normal use.

Internal skirting line, to decorate the inside. The material is PVC.

Sealing strip, used on the joint between wall panel and steel frame, to better prevent rainwater and humid air go inside.

Sealant glue, after installation, you need to seal every gaps.
Construction Site Temporary Steel Labor Camp

Installation Steps:
Construction Site Temporary Steel Labor Camp
Project Show:
Construction Site Temporary Steel Labor Camp

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now