Customization: | Available |
---|---|
After-sales Service: | Perfect Service and Installation Guidance |
Application: | Accomodation, Family House, Holiday House |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Military Containerized Housing Unit
Military Containerized Housing Unit can help people solve house problem in remote areas,
where the garrison is relatively concentrated, the hostel conditions are better, and the social support conditions are better,
the brigade and regiment will carry out unified construction, centralized construction of family apartments,
and implement cross-army and cross-organizational distribution to solve the housing problem.
Security issues for the entire staff and the noncommissioned officer's apartment.
The centralized construction of Military Containerized Housing Unit, the implementation of cross-military
and cross-organization deployment, is to open closed-loop troops, mobilize the resources of the entire army,
and coordinate the construction of family apartments, so that the troops are in a state of poverty and cannot build their
own houses. They can also enjoy family apartments. Preferential policies.
Let the military families no longer live in different places, and the container barracks allow the soldiers
to receive their families around, which can alleviate the soldiers' worries and concentrate on fighting!
The Military Containerized Housing Unit is a new construction method with simple installation,
short construction period and low cost. It can be used for the construction of dormitories, leisure resort hotels and farmyards,
so it is very popular in the market. So in practical applications, what are the advantages of professional household containers and are so popular?
1. Fast construction speed
Compared with traditional construction methods, the construction speed of residential containers is very fast. Since all the modules used are directly processed and formed in the workshop, they only need to be assembled according to the design drawings after arriving at the construction site, which can shorten the construction period by 40-60% and save construction time.
2. Low construction cost
The construction of the brick-concrete structure not only has a long construction period, but also high material and labor costs. However, the use of new construction methods for residential containers can help companies greatly reduce construction costs. At the same time, less labor is required when assembling, which not only reduces the technical dependence of construction workers, but also reduces the total cost of the building. Therefore, compared with the traditional building model, it has better economic benefits.
size | Number of floors | Three Floors |
Type | Container House | |
Unit Area | 18m² | |
Length | 6m | |
Width | 9m | |
Height | 2.8m | |
Floor System | Steel frame | 3mm Galvanized Steel for main structure + 1.5mm square tube for the secondary beam |
Floor | 15mm MGO board + PVC leather floor | |
Roof System | Steel frame | The steel frame is Q235 galvanized fitting; |
Roof insulation | The ceiling is steel pre-coated 0.4mm outside strong steel sheet; With 50mm glass wool insulation material; |
|
Roof ceiling | The ceiling is shaped steel plate with different pattern | |
Column System | Column | 2.5mm Shaped Galvanized Steel |
Sandwich Wall System | Wall Panel | 50mm Sandwich Panel ; The outside color is light silver-gray (0.35mm thickness steel ); Inside is white color steel (0.35mm thickness steel ). |
Door & window system | Door | Material: Steel door Size: 2000*980mm(H*W) |
Window | Material: Aluminum alloy steel double hollow glass sliding window (including screens) Size:1200*1000mm(H*W) |
|
Electric system | Includes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set, Electrical box with safety protection device connecting cable for connecting; |
|
Accessories | Electric wire; sealant; wiring tube; screws and other accessories. |
FAQ?
Q: Are you a factory or trading company?
A: We are a real factory, we have 3 plants in Xinxiang City, Henan Province, China
Q: How about your production capacity?
A: Container House: 1000 sets per month.
Prefab House: 40,000 square meters per week.
Q: How about your quality control?
A: We have got ISO9001:2015 and CE certificate Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.
Q: Is third-party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.
Q: How about your delivery time?
A: Generally within 15 days, it is according to the order quantity, partial shipment is allowed for big orders.
Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do a Turnkey job for some kind of project.
Q: How to ensure the product you supply is what we want exactly?
A: Before placing an order, our sales and engineers team will provide you a suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished project photos are available, which will help you understand the solution we provided deeply.