Pre Steel Structure Construction Camp Building

Product Details
Customization: Available
Connection Form: Bolt Connection
Structure: Steel Structure

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2015-01-05
Management System Certification
ISO 9001, ISO 9000, OHSAS/ OHSMS 18001, ISO 14064
  • Pre Steel Structure Construction Camp Building
  • Pre Steel Structure Construction Camp Building
  • Pre Steel Structure Construction Camp Building
  • Pre Steel Structure Construction Camp Building
  • Pre Steel Structure Construction Camp Building
  • Pre Steel Structure Construction Camp Building
Find Similar Products

Basic Info.

Model NO.
PEB
Material
Steel Structure
After-Sales Service
Perfect Service and Installation Guidance
Wall Material
Alc/ Rockwool/ PU/ Sandwich Panel
Roof
EPS/Glass Fiber Sandwich Panel
Floor
Fiber Cement+PVC Floor, or Customized
Door
Steel Security Door
Window
Aluminum Sliding Window
Warranty
One Year
Usage
Dormitories, Warehouse, Villa, Temporary Offices, Factory, Sheds, Poultry House, Workshop
Certification
CE, ISO, SGS
Customized
Customized
Transport Package
Bulk Shipment by 40hq Shipping Container
Specification
Customized
Trademark
Khome
Origin
Henan, China
HS Code
9406000
Production Capacity
5000 PCS/Month

Product Description

Pre Steel Structure Construction Camp Building


Steel structure building is a building in which construction steel constitutes a load-bearing structure. Generally, beams, columns, trusses and other components made of section steel and steel plates constitute load-bearing structures. Together with the roof, floor and wall and other enclosure structures, they form a replanted building.
Construction section steel usually refers to hot-rolled angle steel, channel steel, I-beam, H-beam and steel pipe. A building whose components constitute a load-bearing structure is called a profiled steel structure building. In addition, cold-rolled thin steel plates, crimped or non-crimped L-shaped, U-shaped, Z-shaped, and tube-shaped thin-walled steel, as well as the load-bearing components formed by small steel such as angle steel, steel bar, etc. Structural building, generally called light steel structure building. Steel has high strength and elastic modulus, uniform material, made steel structure has good plasticity and toughness, high precision, convenient installation, high degree of industrialization, and faster construction.


Pre Steel Structure Construction Camp Building


Advantages of PEB
1 Wide range of uses: applicable to factories, warehouses, office buildings, stadiums, hangars, etc. It is not only suitable for single-story large-span buildings, but also for the construction of multi-story or high-rise buildings.
2 Simple construction and short construction period: All components are prefabricated in the factory, and the site only needs simple assembly, which greatly shortens the construction period. A building of 6000 square meters can be basically installed in just 40 days.
3 Durable and easy to maintain: The steel structure designed by general-purpose computers can withstand harsh weather and requires simple maintenance.
4 Beautiful and practical: the lines of the steel structure building are simple and smooth, with a modern sense. The color wall panel has a variety of colors to choose from, and the wall can also be made of other materials, so it is more flexible.
5 Reasonable cost: The steel structure building is light in weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible. The overall economic benefits are much better than concrete structure buildings.


Pre Steel Structure Construction Camp BuildingPre Steel Structure Construction Camp Building

Main Parts Item Name Specification
Main Steel Frame Steel Column Q235B, Q355B
H shape, Box, Steel pipe, Hot rolled sheet
Steel Beam Q235B, Q345B
H shape, Steel Truss, Hot rolled sheet
Supporting System Brace Q235B, Q355B
Steel rod, Steel pipe, Angle steel
Roof Purlin C or Z shape, Steel purlin
Wall Purlin Q235B, Q346B
C or Z shape, Steel purlin
Roof Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool, etc., 
Wall Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool, etc., 
Accessories Bolts Ordinary, High strength
Gutter Galvanized Steel plate, Stainless steel
Windows Aluminum alloy-Glass, Aluminum alloy-shutter, PVC
Doors Sliding or Rolling door
Downpipes PVC pipe, Color steel pipe
Edge Cover Made of color steel sheet thickness 0.5mm
Ventilator Stainless steel
Crane Crane in 5 tons to 20 tons 



Pre Steel Structure Construction Camp BuildingPre Steel Structure Construction Camp BuildingPre Steel Structure Construction Camp Building

Pre Steel Structure Construction Camp Building



Questionnaire
 

Below issues that are needed to make the solution.

3.1 Location (where will be built? ) _____country, area

3.2 Size: Length*width*height _____mm*_____mm*_____mm

3.3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

3.4 snow load (max. Snow height)

_____kn/m2, _____mm

3.5 anti-earthquake _____level

3.6 brick wall needed or not If yes, 1.2m high or 1.5m high

3.7 thermal insulation If yes, EPS, fiberglass wool, Rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.

3.8 door quantity & size _____units, _____(width)mm*_____(height)mm

3.9 window quanity & size _____units, _____(width)mm*_____(height)mm

3.10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier