Prefab house is a light house product, it don't need special fundation, durable steel structure and insoluted maintenance materials has give many clients good experience.
The 2-story prefab office total has office rooms, there are office rooms in first floor, and in second floor, the size of the room is 3.64m*5.46m, so it'll leave enough space for workers, the size can be customized if you have required size, such as adding purbic toilet room, storage room and etc. so the layout can be change and has a good experience.
Compared with cement traditional building, the steel house has many advantages as followiing:
1. Convenient transportation, especially suitable for units that frequently change construction sites;
2. Rugged and durable, all made of steel, with strong earthquake resistance and deformation resistance;
3. Good sealing performance, strict manufacturing process makes this kind of mobile room have good water tightness;
4. The mobile house is based on a standard steel chassis, which can derive a lot of combined space. Such as meeting rooms, dormitories, kitchens, bathrooms, etc. The standard width is 2.4 meters, the height is 2.2 meters, and the length is 4 to 12 meters;
5. Convenient disassembly and assembly, superior performance, stable and firm, good shockproof performance, waterproof, fireproof and anticorrosive, light weight. The house is an integral structure with a frame inside, and the walls are made of color steel composite panels, and the service life can reach more than 10 years
6. The cost of the mobile house is lower. Due to some characteristics of the mobile house, compared with some brick and tile houses, it has a lower cost.
7. The construction speed of a mobile house is very fast. An installation team can install more than 500 square meters a week. This is hard to imagine in the field of traditional construction, and such a building will not produce construction waste. This is undoubtedly a good protection for the environment, which is in line with the current needs.
During the construction of a large number of permanent buildings, structures, roads and bridges and traffic facilities, and in the future, a large number of prefab temporary housing and supporting facilities are needed. In addition, in industries that require long-term field work and open-air work, temporary houses that meet different requirements are required for emergency needs, disaster relief, travel and festivals.
Therefore, various prefab emergency shelter came into being. With the progress of the times, the improvement of working conditions, and the need to build a harmonious society, the country has high requirements for the safety, applicability and improvement of living conditions of Prefabricated Labor camp.
FAQ?
Q: Are you a factory or trading company?
A: We are a real factory, we have 3 plants in Xinxiang City, Henan Province, China
Q: How about your production capacity?
A: Container House: 1000 sets per month.
Prefab House: 40,000 square meters per week.
Q: How about your quality control?
A: We have got ISO9001:2015 and CE certificate Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.
Q: Is third-party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.
Q: How about your delivery time?
A: Generally within 15 days, it is according to the order quantity, partial shipment is allowed for big orders.
Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do a turnkey job for some kind of project.
Q: How to ensure the product you supply is what we want exactly?
A: Before placing an order, our sales and engineers team will provide you a suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished project photos are available, which will help you understand the solution we provided deeply.