Customization: | Available |
---|---|
Material: | Steel Structure |
Wall Panel: | PU /EPS/Rock Wool Sandwich Panel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fastest Building Construction Container Hospital for Emergency Treatment |
The hospital is composed of 60 container houses of different sizes. According to the design of China's standardized hospital, it not only has well-equipped wards, bathrooms, and equipment rooms, but also has conventional inspection facilities such as ultrasound, electrocardiogram, and monitors. It can be said to be a mobile, miniature version of the hospital. The container hospital retains the industrial elements of the container module in its appearance. In order to make full use of the fragmented land construction form and combine the concept of green environmental protection, it has created a new field of modular building applications. The container hospital has the advantages of being solid and durable, moving quickly, and being recyclable. It can not only withstand magnitude 11 winds and magnitude 8 earthquakes, but also have a service life of more than 15 years. In addition to combating infectious diseases, medical relief containers can also be used for natural disasters such as earthquakes and floods, which are versatile and flexible in emergency affairs. |
INSIDE SHOW
The functions of negative pressure isolation ward for infectious diseases are mainly two points: -The first is to use the principle of negative pressure to isolate pathogenic microorganisms, and at the same time, the indoor air polluted by patients is discharged after special treatment, which will not pollute the environment; -The second is to dilute the concentration of pathogenic microorganisms in the ward through ventilation and reasonable airflow organization, and place the medical staff in a favorable wind direction to protect the medical staff's work safety. The negative pressure isolation ward for infectious diseases generally consists of three parts: a ward, a buffer room, and a bathroom. We will purchase professional hospital supporting equipment according to your needs. |
Item | Specification | |
Part 1 | Roof System | |
I. | Steel frame | Steel frame is Q235 galvanized fitting; |
II. | Roof insulation | Ceiling is blue color steel pre-coated 0.4mm outside strong steel sheet; With 50mm glass wool insulation material; |
III. | Roof ceiling | Ceiling is shaped steel plate with different pattern |
Part 2 | Floor System | |
I. | Steel frame | 3mm Galvanized Steel for main structure + 1.5mm square tube for secondary beam |
II. | Floor | 15mm chipboard + PVC leather floor |
Part 3 | Column System | |
I | Column | 2.5mm Shaped Galvanized Steel |
Part 4 | Sandwich Wall System | |
I | Wall Panel | 50mm EPS Foam Sandwich Panel; Outside color is light silver gray (0.35mm thickness steel ); Inside is white color steel (0.35mm thickness steel ). |
Part 5 | Door & window system | |
I. | Door | Material: Steel door Size: 2000*980mm(H*W) |
II. | Window | Material: Aluminum alloy steel double hollow glass sliding window (including screens) Size: 1200*1000mm(H*W) |
Part 6 | Electric system | |
I. | Electric system | Includes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set, Electrical box with safety protection device connecting cable for connecting; |
Part 7 | Accessories | Electric wire; Sealant; Wiring tube; Screws and other accessories. |
Q: Are you factory or trading company? A: We are real factory, we have 3 plants in Xinxiang City, Henan Province, China. Q: How about your production capacity? A: Container House: 800 sets per month. Prefab House: 40, 000 square meter per week. Q: How about your quality control? A: We have got certificate ISO9001: 2015. Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects. Q: Is third party inspection available? A: SGS, BV, TUV, etc. Are available, it is according to client requirement. Q: How about your delivery time? A: Generally within 30 days, it is according to order quantity, partial shipment is allowed for big order. Q: What about the installation? A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do turnkey job for some kind of projects. Q: How to ensure the product you supply is what we want exactly? A: Before placing order, our sales and engineers team will provide you the suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished projects photos are available, which will help you understand the solution we provided deeply. |