• China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
  • China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
  • China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
  • China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
  • China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
  • China Peb Wholesale Metal Frame Building Construction Prefab Warehouse

China Peb Wholesale Metal Frame Building Construction Prefab Warehouse

Wall Material: Alc Panel / Sandwich Panel
Roof: EPS/Glass Fiber Sandwich Panel
Floor: Fiber Cement+PVC Floor, or Customized
Door: Steel Security Door
Window: Aluminum Sliding Window
Material: Steel Structure
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Usage
Warehouse, Villa, Temporary Offices, Workshop
Certification
ISO, CE
Customized
Customized
Transport Package
Standard Export Package
Specification
Customized
Trademark
Khome
Origin
Henan, China
HS Code
9406000
Production Capacity
5000 PCS/Month

Product Description

China PEB Wholesale Metal Frame Building Construction Prefab Warehouse

As the demand of business, warehouse demand is growing quickly, as the chnages for industry need, the cost to build warehouse, the management cost and maintence is increasing, inorder to meet these need, prefan engineered building has been the best solution, it plays a important role in standard construction, there are some advantages as following:
Since the prefabricated engineer building is connected by screws and bolts, so it can save much design time, our professional design team Specialized computer analysis and design programs optimize material require. Drafting also computerized using standard details that minimizes projectcustom details. The low-weight flexible frames offer higher resistance to seismic forces.



China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
Advantages:
1.Low cost
the prefab engineer building can save design cost, manufacture cost, and installation cost, the designs for house components can make the total weigt lighter so that lower the cost.
2.foundatin is simple. the total weight of the steel structure is light than traditional building, so it'll make the installatin easier.
Fast installation
all the house parts are connected by screws and bolts. so the installatin speed is fast.
3.expandable: the size is feasible, the width and the length can be expand easily.
4.low maintance
the house are a combinatin of galvanized steel structure and sandwich panel, it can easily suit to local climate.the maintance is easy.
China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
China Peb Wholesale Metal Frame Building Construction Prefab WarehouseChina Peb Wholesale Metal Frame Building Construction Prefab WarehouseChina Peb Wholesale Metal Frame Building Construction Prefab WarehouseChina Peb Wholesale Metal Frame Building Construction Prefab WarehouseChina Peb Wholesale Metal Frame Building Construction Prefab WarehouseChina Peb Wholesale Metal Frame Building Construction Prefab Warehouse
China Peb Wholesale Metal Frame Building Construction Prefab Warehouse
If you interested in it, please provide the following steel structure building importance calculation factors for quotation :

(1)  Exact size : length * width *height ;
(2)  Wind speed (max speed);
(3)  Snow load (kg/m2 in max situation);
(4)  Earthquake grade (if have) ;
(5)  Live load and dead load for roof and flooring(special for multi-floors building);
(6)  The requirements for window and door;
(7)   Max height and weight for the crane to lift;
(8)   What are the materials for the roof and wall?

 

FAQ?
1. How can the products adapt to different climates)?
Strong wind region:   improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve the anti-pressure ability of the structure.
High corrosion region: use corrosion-resistant material, or paint anticorrosive coating.
2. How long is the delivery time?
Regularly 7-15 days, this depends on quantity and products.  
3. How can I get a quotation for the projects?
If you have a drawing, we can offer you a quotation according to your drawing.
If you don't have one, our engineer will design a drawing for you to confirm and then offer you a quotation.

After-sales service

K-home promises after-sales service promises to provide after-sales service and maintenance for customers

  • Provide customers with detailed usage and maintenance manuals
  • Quality problems occur during using, communicate and solve actively
  • Committed to building a global network, better service for customers
  • Regular return visits and maintenance to customers

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now