Customization: | Available |
---|---|
Application: | Accomodation, Family House, Holiday House |
Fast Installation: | Fast Installation |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Three years after the 9.0 magnitude Tōhoku earthquake and subsequent tsunami that caused the Fukushima nuclear meltdown, it was time to start rebuilding the area. The site needed modular flat pack containers to construct quick temporary housing for workers who were there to help final cleanup and rebuilding.
In 2014, the main issues the Fukushima area was dealing with was toxic groundwater from the radioactive spill off.
Japan needed safe accommodations, canteens, and emergency facilities for more than 1,200 scientists, relief, and construction workers to continue cleaning the site and start rebuilding. A China manufacturer was selected to deliver all-in-one emergency modular flat pack containers as housing shelters. The site needed a total of 3,500 square meters of living space in 25 days. It took 8 days to assemble the modular flat pack containers structures, after which the next stage of Fukushima site cleanup was able to commence.
INSIDE SHOW
1. Convenient for transportation, fast and convenient lifting
2. High strength: Welded steel frame to meet strength requirements. It is the building unit with the best seismic performance in the building, which is very suitable for post-disaster reconstruction
3. The whole top is welded, and the whole board is waterproof and leak-proof design, which is more safe and reliable.
4. Beautiful appearance: the wall is made of color steel sandwich panel, small plate combination design, the product is connected scientifically, and the surface is smooth and smooth
5, Strong weather resistance: good resistance to acid, alkali, salt spray and other corrosive, suitable for a variety of humid and corrosive environments. With waterproof, sound insulation, heat preservation, sealing, easy to clean, easy to maintain, beautiful appearance, etc.
6. Typical applications: offices, conference rooms, staff quarters, prefab military camp, prefab labor camp, prefabricated shops, prefabricated schools, prefabricated hotels, prefabricated factories, etc.
size | Number of floors | Three Floors |
Type | Container House | |
Unit Area | 18m² | |
Length | 6m | |
Width | 9m | |
Height | 2.8m | |
Floor System | Steel frame | 3mm Galvanized Steel for main structure + 1.5mm square tube for secondary beam |
Floor | 15mm MGO board + PVC leather floor | |
Roof System | Steel frame | Steel frame is Q235 galvanized fitting; |
Roof insulation | Ceiling is steel pre-coated 0.4mm outside strong steel sheet; With 50mm glass wool insulation material; |
|
Roof ceiling | Ceiling is shaped steel plate with different pattern | |
Column System | Column | 2.5mm Shaped Galvanized Steel |
Sandwich Wall System | Wall Panel | 50mm Sandwich Panel ; Outside color is light silver gray (0.35mm thickness steel ); Inside is white color steel (0.35mm thickness steel ). |
Door & window system | Door | Material: Steel door Size: 2000*980mm(H*W) |
Window | Material: Aluminum alloy steel double hollow glass sliding window (including screens) Size:1200*1000mm(H*W) |
|
Electric system | Includes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set, Electrical box with safety protection device connecting cable for connecting; |
|
Accessories | Electric wire; sealant; wiring tube; screws and other accessories. |
Q: Are you factory or trading company?
A: We are real factory, we have 3 plants in Xinxiang City, Henan Province, China
Q: How about your production capacity?
A: Container House: 1000 sets per month.
Prefab House: 40,000 square meter per week.
Q: How about your quality control?
A: We have got ISO9001:2015 and CE certificate Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.
Q: Is third party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.
Q: How about your delivery time?
A: Generally within 15 days, it is according to order quantity, partial shipment is allowed for big order.
Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do turnkey job for some kind of projects.
Q: How to ensure the product you supply is what we want exactly?
A: Before placing order, our sales and engineers team will provide you the suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished projects photos are available, which will help you understand the solution we provided deeply.