Customization: | Available |
---|---|
Fast Installation: | Fast Installation |
Feature: | Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. The construction speed of container houses is 7-8 times that of ordinary buildings, basically no water problem is involved, and they are dry buildings. 2. The container house is a steel structure keel, which can be reused and conforms to the current energy conservation and environmental protection policy. 3. The overall weight of the container house is light, and the key components are high-strength connections, so even in the event of an earthquake, it will not collapse and resist earthquakes. 4. The construction cost of container houses is lower than that of traditional concrete buildings, and low cost is its biggest advantage. 5. Container houses can avoid the environmental hazards caused by the brick kilns in traditional buildings. 6. The wall of the container house is thinner than traditional buildings, so the effective use area will be higher without affecting its robustness. Please leave your query here for more information from us.
The size of container home can be customized, the following specifications are only for the container home in the picture. We can make customized production according to the size you need, the appearance color of container house and the thickness of sandwich layer can be customized.
|
size | Number of floors | Single Floors |
Number of container house | 3 units | |
Covered Area | 54m² | |
Length | 6m | |
Width | 9m | |
Height | 2.8m | |
Floor System | Steel frame | 3mm Galvanized Steel for main structure + 1.5mm square tube for secondary beam |
Floor | 15mm chipboard + PVC leather floor | |
Roof System | Steel frame | Steel frame is Q235 galvanized fitting; |
Roof insulation | Ceiling is blue color steel pre-coated 0.4mm outside strong steel sheet; With 50mm glass wool insulation material; |
|
Roof ceiling | Ceiling is shaped steel plate with different pattern | |
Column System | Column | 2.5mm Shaped Galvanized Steel |
Sandwich Wall System | Wall Panel | 50mm EPS Foam Sandwich Panel ; Outside color is light silver gray (0.35mm thickness steel ); Inside is white color steel (0.35mm thickness steel ). |
Door & window system | Door | Material: Steel door Size: 2000*980mm(H*W) |
Window | Material: Aluminum alloy steel double hollow glass sliding window (including screens) Size:1200*1000mm(H*W) |
|
Electric system | Includes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set, Electrical box with safety protection device connecting cable for connecting; |
|
Accessories | Electric wire; sealant; wiring tube; screws and other accessories. |
Henan K-home Steel Structure Co.,Ltd is located in Xinxiang, Henan Province. It is a self operating private enterprise, established in the year of 2007,registered capital RMB 20 million, cover an area of 100,000.00 square meters with 260 employees. We are engaged in design, project budget, fabrication, installation of steel structure and sandwich panels with second-grade general contracting qualification. Our main products covered sandwich panels, OEM prefab house, container house, construction material, light steel structure house, light steel villa, non-standard design house, steel structure projects, and installation service.
1.Provide customers with detailed usage and maintenance manuals 2.Quality problems occur during using, communicate and solve actively 3.Committed to building a global network, better service for customers 4.Regular return visits and maintenance to customers
Strong wind region: improve the wind-resisting ability of the internal structure. Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure. High corrosion region: use corrosion resistant material, or paint anti corrosive coating. 2. How about the payment? By TT, 40% deposit in advance, the 60% balance before the delivery. 3. How long is the delivery time? Regularly 7-15 days, this depends on quantity and products. 4. How about the delivery date? Yes. We can accord your requirements. |