• Fast Construction Container Cabin Used for Foreign Worker Dormitories
  • Fast Construction Container Cabin Used for Foreign Worker Dormitories
  • Fast Construction Container Cabin Used for Foreign Worker Dormitories
  • Fast Construction Container Cabin Used for Foreign Worker Dormitories
  • Fast Construction Container Cabin Used for Foreign Worker Dormitories
  • Fast Construction Container Cabin Used for Foreign Worker Dormitories

Fast Construction Container Cabin Used for Foreign Worker Dormitories

After-sales Service: Perfect Service and Installation Guidance
Warranty: 1 Year
Material: Steel Structure
Usage: Dormitories, Temporary Offices, School, Hospital, Toilet
Certification: ISO, CE, SGS
Customized: Customized
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KHCD
Transport Package
40FT Shipping Container
Specification
3000*5950*2800mm or Customized
Trademark
KHOME
Origin
Henan, China
HS Code
9406900090
Production Capacity
8000 Square Meters/Month

Product Description

                                         Fast Construction Container Cabin Used for Foreign Worker Dormitories

Fast Construction Container Cabin is the most sector to consider in remote site, because building in site is a hard
and tired work, also it is associated with offsite projects, every worker exposed in bad environment,
such as the wind climate, cold or hot place, so one detachable container house is very important and necessary for them.

The offered ready made labour quarters are widely cherished to be used as temporary shelters for laborers associated with
offsite projects.
These quarters are manufactured using the lightweight and electrically insulated panels with the help of progressive techniques. Providing effective ventilation and comfort to the users, these construction site dormitory are easily as well as quickly customized as per the precise requirements of the clients.

Key Features of 
Fast Construction Container Cabin
1.Customizable dimensions and configurations to meet any special need.
2.Walls and ceiling panels consist of a galvanized steel exterior with a core made from non-combustible structural rock wool to provide insulated, temperature-controlled shelter.
Wall panel design is water resistant and durable for relocation, pack up and shipping.
Fast Construction Container Cabin Used for Foreign Worker Dormitories

Fast Construction Container Cabin Used for Foreign Worker Dormitories
Fast Construction Container Cabin Used for Foreign Worker Dormitories
Item  Specification 
 Part 1: Roof System (roof plate + roof purlin + roof insulation + ceiling)
 1  Roof Plate

 Roof tile is 0.5 mm thickness steel sheet;

 Pre-coated and color coated;

 2  Roof Purlin

 1pc 40x80mm Galvanized Square tube
+ 2pcs 40x60mm Galvanized Square tube

+ 5pcs 40x80mm Galvanized Square tube;

 3  Roof Insulation  50 mm glass wool insulation material;
 4

 

 Ceiling

 Ceiling is 0.4 mm thickness shaped steel plate;

Pre-coated and color coated;

 Part 2: Steel Frame (Corner post + column + beam + bolt)
 1  Corner Connection Part

 Material: 4 mm Thickness Shaped Steel, surface spray treated by machine after repeatedly polished;

 Size: 160* 160* 160 mm (Bottom)

&160* 160* 180 mm (Top);

 2  Column

 Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;

 

 Size: 160* 160* 2480mm;

 3  Top and Floor Long Beam

 Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;

 Size 1: 3680* 60* 160 mm;

Size 2: 5680* 60* 160 mm;

 4  Top & Floor Short Beam

 Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;

 Size 1: 2680* 60* 160 mm;

 5  Bolt

 High strength galvanized steel bolt;

 To fix the Corner Connection Part and beam, Corner Connection Part and column;

 Part 3: Floor System (Floor structure + floor panel + floor leather)+Wall Panel
 1  Floor Purlin

 Material: 10pcs 40x80mm Galvanized Square tube
+4pcs 40x80mm Galvanized Square tube
+2pcs 30x50mm Galvanized Square tube;

 2  Floor Panel

 18 mm MGO board

 3  Wall Panel

 50 mm rock wool sandwich Panel;

 Outside color is light silver gray (0.38mm thickness steel );
 Inside is white color steel (0.38mm thickness steel ).

 Part 4: Drainage system (Top drainage channel + drain pipe)
 1  Water drain pipe  and channel

 Water drain pipe:
 Diameter: 50mm
 Length: 2700mm;
 Water drain channel: 90(W)x50(H)mm;

 Part 5 : Door & window system
 1  Standard Door

 Size 1: 930mm*2000mm
 Material: sandwich panel/steel door;

 2  Window

 Size 1: 930mm*1200mm
 Plastic steel single glass sliding window (including screens) With 0.35mm   Double glass and strength pvc window frame/Glass Window;
 Window rail is smooth.

 Part 6: Electricity System
 1  Lamp

 Type: LED energy saving lamp;
 Power: 24W
 Include: Two sockets and one switch;
 Note: The socket will be equipped according to the local standard.
 Includes: electric wire and conduit;
 Use: The electric wire will be in the conduit and go through the wall panel for concealed installation.

 2  Socket & Switch
 3  Electric Wire
 4  Air Circuit Breaker
 Part 7: Internal Decoration
 1  Internal Corner

 Material: PVC;
 Includes: Vertical internal corner and horizontal internal corner.

 2  Steel Plate for Internal Connection

 Material: Stainless Steel;
 Used on the joints between two bottom frames when different containers connected with each other.

 3  Floor Leather

 Material: PVC
 Thickness: 1.6mm
 Features: moisture proof; wear resisting;
anti-corrosive and thermal insulation.

 Part 8: Installation Accessories
 1  Sealant  Used for the joints of doors and windows for better waterproof.
 2  Structure Adhesive  Used for the reinforcement and seal of the steel frames.
 3  Screws  Include: rivets, bolts, drill tail screw;
 
Fast Construction Container Cabin Used for Foreign Worker Dormitories
FAQ:
Q: How to install?
A: 1. It's not difficult, because all the parts is modular produced and screw connected structure, so all the parts can be connected
easily and very fast. 
2. We will support you most, now we have a detailed installation manual, and detailed installation guidance video, it will help you
to assemble step by step. And we can help you via online video.
3. Usually 3 skilled worker could assemble 2 units in one day. 
4. In this pandemic period, we help Singapore client completed a worker dormitory; It was their first time to use our container house,
and we can't send our engineer abroad, they completed 80 units in 2 weeks.  

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now