Dust-Proof Workshop, Electrostatic Workshop, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile and Electronic Processing, Warehouse, Dust-Proof Workshop, Electrostatic Workshop, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile and Electronic Processing, Warehouse, Villa, Temporary Offices, Workshop
Material
Steel Structure
Wall Material
Alc Panel
Roof
EPS/Glass Fiber Sandwich Panel
Floor
Fiber Cement+PVC Floor, or Customized
Door
Steel Security Door
Window
Aluminum Sliding Window
Certification
ISO, CE
Customized
Customized
Transport Package
Standard Export Package
Specification
Customized
Trademark
Khome
Origin
Henan, China
HS Code
9406000
Production Capacity
5000 PCS/Month
Product Description
Long life time prefabricated steel residential house building is popular to the whole world,the main materials for the metal frame are square tube,H section steel,angle steel,round tube and so on,the roof and wall materials are ALC cement composite board, the thickness can be 50mm, 75mm, 100mm, 125mm,150mm,200mm,clients can according their requirement to choose the suitable thickness . The flooring of building is ALC cement board or place concrete at project site . The life time of whole steel building same to traditional concrere building,more than 100 years,but more fast for installation and cheaper.
It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence and so on.
Inside Show
Good cladding materials for long life time steel buildings-ALC board Autoclaved aerated cement panel (block) refers to the siliceous and calcareous materials as the main raw material, aluminum powder as the foaming agent, through high temperature and pressure steam to produce the panel (block),the panel include reinforced mesh to enhance the strength. It is a lightweight, high strength and porous green wall material. It is not aging and has good durability. The service life of the panel(block) can be matched with the service life of all kinds of buildings. Therefore, it is commonly used as thermal insulation board, wall board, , Roof, floor, fire board and so on for different kind of steel structure building and traditional concrete building.
Common size specifications: Length is 0-6 meters, width: 600mm, thickness 75,100,125,150,175,200,250,300 mm.
Specifications
1)Size: MOQ is 100m2, width X length X eave height, roof slope
2)Type: Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors!
3) Base: Cement and steel foundation bolts
4) Column and beam: Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-section or Variable cross-section!
5) Bracing: X-type or V-type or other type bracing made from angle, round pipe, etc
6) C or z purlin: Size from C120~C320, Z100~Z200
7) Roof and wall panel: Single colorfull corrugated steel sheet0.326~0.8mm thick, (1150mm wide), or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~100mm,
8)Accessories: Semi-transparent skylight belts, Ventilators, down pipe, Glavanized gutter, etc
9)Surface: Two lays of Anti-rust Painting!
10) Packing: Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ! Equipment
STEEL STRUCTURE MEMBERS PRODUCTION (Fabrication) PROCESS :
1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;
2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)
3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)
4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)
5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.
6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )
Packing&Delivery
If you interested in the villa, please provide the following steel structure building importance calculation factors for quotation :
(1) Exact size : length * width *height ;
(2) Wind speed (max speed);
(3) Snow load (kg/m2 in max situation);
(4) Earth quake grade (if have) ;
(5) Live load and dead load for roof and flooring(special for mutli-floors building);
(6) The requirements for window and door;
(7) Max height and weight for crane to lift;
(8) What are the materials for roof and wall ?