Rapid Build Pre Manufactured Homes for Staff Quarters
Do you need a solution for your worker accommodation in a fast and meanwhile the cheapest way?
We K-Home can create a space that meets your exact needs. We are more than happy to discuss your specific needs and create a space that includes the layout, specification, and features that you need.
Among temporary houses, the net-frame house, which is what we call K type house, should be the cheapest, about 40-80USD per square meter.
The most common and economical K room you see is the following 3K.Sandwich Panel Prefabricated Site Office
All the dormitory is next to each other, people could go entre the room from outside, each room is 3K*2K, it is 19.88square meters, could accommodate 4 beds maximum. There is one window on backside to make sure the air could goes fluently inside. And the toilet room on both sides, it could change to shower room also.
After Assemble the photos like below
Both sides only have windows, the entrance door from inside the building.
Interior like pictures below
Our package and delivery way is the most economiest way, the method like below
FAQ
1. How to install the houses in the site?
We can offer you three type of insisting on the installation:
1.1 : We can offer you the manual include the photos and drawings, or some videos for help you on the installation. And you will organize the local people to install it. 93% of our clients finished their houses in this way.
1.2: We can send our people to your site to guide your people to install. Or send team people (3-5 people) to your site to install for you. This way is most easy way, but you need to pay their round-way tickets, local food, accommodation, transportation, communication and salary, and also their security on the site. Almost 5% of our clients choose this way. And in the normal we will require the order should be more than 100000USD.
1.3: You can send your people (engineers or the technician) to our company to study the installation details. 2% of our clients choose this way for their orders.
2. The advantage of the prefab house.
2.1 : Recycle using: you can assemble it in the site A, then disassemble and install again in the site B, then site C. In such way, there is no industrial rubbish after you finish the jobs in the site.
2.2 : Low cost. The steel structure is much lower on the cost then the tradition building.
2.3 : Quickly installation. In the normal, 6 skilled persons team can install 150 sq.m house every day.
2.4: safety: the prefab house can resistance 7 grade earthquake, and 100km/H wind.
3. The mainly use of the prefab house:
In the normal it's mainly used as temporary building in the site, such as temporary office, labor accommodation, etc. And in the recent years, the prefab house is largely use in the resettlement housing in some disaster area. In 2008, it played a major role on the resettling the victims after the terrible earthquake on 12th, May, 2008.
4. How to maintain your prefab house?
4.1: First of all, when the prefab house is installed, it's better not to make any other changes, like an expansion, adding partitions or cutting down the walls, or removing screws, and so on.
4.2 : Made the re-paint every 1-2 years after you install it. Such way can increase its service life and keep beautiful.
4.3 : Finally, do not tie the wire to the prefab house, which will lead to the prefab house uneven force and easily cause electric shock accident.
5. How to prepare the foundation for the K style prefab house?
In the normal we will offer you the foundation drawing to prepare the foundation. In the normal the K style house is the strip foundation.
6. How many flooring can the K style prefab house build?
In the normal we will suggest you to do the K style prefab house in 1 floor or 2 floors. And the highest one is 3 floors if you need. And will suggest you not build the house more than 3 floors by K style house. If you want to build the house more than 3 floors you better choose the design of T house design supported by the H shape steel
By the way, if you want to layout the toilet room in the K style prefab house, you'd better made it in the ground floor for the water proofing.
7. The materials option for the thermal insulation:
We have 3 materials for your option:
They are: EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, PU (polyurethane) sandwich panel.
After sales service
K-home promises after sales service promises to provide after-sales service and maintenance for customers
Provide customers with detailed usage and maintenance manuals
Quality problems occur during using, communicate and solve actively
Committed to building a global network, better service for customers
Regular return visits and maintenance to customers
Any questions, pls send an enquiry to us!