Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Material: | Sandwich Panel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Low Cost Prefab Metal Family Home Kit
Building a metal home kit is a wonderful investment! Building with our steel framed systems you are getting superior strength, better energy efficiency, less maintenance, a non-combustible material, and the use of a renewable green product in your prefab home's main frame support system. This alone makes it the preferred material to build for your family to deter maintenance cost and have that added protection in case of threatening weather or fire situations.
The material has good plasticity and toughness, can be deformed greatly, and can withstand dynamic loads well;
High processing precision, high efficiency, and good airtightness;
High strength, lightweight, high rigidity, and strong stability;
The prefab homes are composed of light steel as a structure and enclosed with the sandwich panel. The choice of the sandwich panel is also very important.
The sandwich panels are divided into foam sandwich composite panels, rock wool sandwich composite panels, and glass wool composite panels.
The foam sandwich panel is light in weight, convenient in construction, and has good thermal insulation.
The biggest advantage of rock wool sandwich panels is that they have excellent fire resistance. They belong to Class A non-combustible materials, but they are slightly heavier. At the moment when life safety is emphasized, the scope of use continues to expand and is increasingly accepted by the market
Advantages of prefab house construction
1. The prefab house has a high degree of integration, shortens the construction period, and greatly reduces the cost:
The modular standard of temporary building facilities has realized the large-scale production of temporary industries and improved the pre-engineering design of buildings, so that temporary building components with different shapes, different materials, and different production methods have a certain versatility.
At the same time, the pre-engineering of temporary construction facilities combines the processing and installation of materials, greatly reducing construction costs and safety; and speeding up the construction speed, shortening the construction period by more than 60%, thus speeding up the capital turnover of the construction unit and making The construction site can start work earlier.
2. The prefab house can meet the requirements of ultra-high and ultra-span: the light steel structure material has a uniform structure, high strength and high elastic modulus. The ratio of density to strength is much smaller than that of concrete and masonry. Under the same force conditions, the light steel structure has a smaller dead weight, which can make the span larger and larger. Light steel integrated shell.
3. Prefab house design and function integration make temporary construction facilities more functional: In temporary construction facilities, light steel structure has become an important factor in image formation. The shape, components and nodes of the structure largely lead to and limit the image of the temporary building. Only the design and function integration of buildings and structures can make buildings more functional, so subsequent design steps can be performed to create temporary building facilities that blend technology and art.
No. | Name | Single Story T-type Prefab House | Two Story T-type Prefab House |
1 | Ground groove, stuck groove | 1.2mm galvanized shaped steel | 1.2mm galvanized shaped steel |
2 | Column | 80# square steel tube / 14# C type Steel | 80# square steel tube / 14# C type Steel |
3 | Around beam | 100# Square steel Tube | 100# Square steel Tube |
4 | Floor Beam | - | 150 C type steel & double 120 C type Steel |
5 | Floor purlin | - | 120 C type steel |
6 | Roof main beam | 100mm square steel tube roof structure | 100mm square steel tube roof structure |
7 | Roof secondary beam | 80mm square steel tube roof structure | 80mm square steel tube roof structure |
8 | Stair | - | C 160*50*20*2 & 3mm steel plate |
9 | Walkway plate | - | 3mm steel plate |
10 | Wall panels | 50mm EPS sandwich panel/glass wool sandwich panel | |
11 | Partition panels | 50mm EPS sandwich panel/glass wool sandwich panel | |
12 | Roof panels | 50mm EPS sandwich panel/glass wool sandwich panel | |
13 | Floor plate | - | 15mm chipboard |
14 | Window | Plastic steel window/ aluminum window | |
15 | Door | Steel door |
FAQ
1. You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. you will can get best and most competitive price after visiting us.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.
4. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements.
5. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30 days after receiving deposit.
6.How can I get the quotation of the project ?
If you have drawing, we can offer quotation accordingly.
If you don't have design, we will design some drawings for your confirmation, and then offer quotation.