• Complete Solution Provided Manufacturer Pre-Engineered Building Construction
  • Complete Solution Provided Manufacturer Pre-Engineered Building Construction
  • Complete Solution Provided Manufacturer Pre-Engineered Building Construction
  • Complete Solution Provided Manufacturer Pre-Engineered Building Construction
  • Complete Solution Provided Manufacturer Pre-Engineered Building Construction
  • Complete Solution Provided Manufacturer Pre-Engineered Building Construction

Complete Solution Provided Manufacturer Pre-Engineered Building Construction

Material: Steel Structure
Usage: Warehouse, Villa, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Wall Material: Alc Panel / Sandwich Panel
Roof: EPS/Glass Fiber Sandwich Panel
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Floor
Fiber Cement+PVC Floor, or Customized
Door
Steel Security Door
Window
Aluminum Sliding Window
Transport Package
Standard Export Package
Specification
Customized
Trademark
Khome
Origin
Henan, China
HS Code
9406000
Production Capacity
5000 PCS/Month

Product Description

Complete Solution Provided Manufacturer Pre-engineered Building Construction 
 

The components of pre-engineered building construction are manufactured off-site and then assembled on-site. It involves the use of pre-designed and pre-fabricated steel or metal building systems.

The process of pre-engineered building construction typically includes the following steps:
 

  1. Design: An architect or engineer creates a design based on the specific requirements of the building, including size, layout, and intended use. This design takes into consideration the pre-engineered building system being used.

  2. Manufacturing: Once the design is finalized, the building components are manufactured off-site in a factory or fabrication facility. This includes fabricating structural frames, wall panels, roof panels, doors, windows, and any other necessary elements.

  3. Transportation: After the manufacturing process, the pre-fabricated components are transported to the construction site.

  4. Site Preparation: The construction site is prepared for the assembly of the pre-engineered building. This includes clearing and leveling the ground, providing necessary utilities, and preparing the foundation if required.

  5. Assembly: The pre-fabricated components are then assembled on-site according to the design plans. This involves erecting the structural frames, attaching wall and roof panels, installing doors, windows, and other components.

  6. Finishing: Once the main structure is assembled, the building is finished by connecting utilities, installing interior finishes, HVAC systems, electrical and plumbing systems, and any other necessary finishes.


The advantages of pre-engineered building construction include faster construction timelines, cost-effectiveness, versatility in design, sustainability, and ease of expansion or modification in the future.

It is worth noting that while pre-engineered building construction is commonly used for industrial, commercial, and warehouse structures, it can also be utilized for residential buildings, educational facilities, healthcare centers, and more.

Complete Solution Provided Manufacturer Pre-Engineered Building ConstructionComplete Solution Provided Manufacturer Pre-Engineered Building ConstructionComplete Solution Provided Manufacturer Pre-Engineered Building ConstructionComplete Solution Provided Manufacturer Pre-Engineered Building ConstructionComplete Solution Provided Manufacturer Pre-Engineered Building ConstructionComplete Solution Provided Manufacturer Pre-Engineered Building ConstructionComplete Solution Provided Manufacturer Pre-Engineered Building Construction
Complete Solution Provided Manufacturer Pre-Engineered Building Construction
If you interested in the villa, please provide the following steel structure building importance calculation factors for quotation :

(1)  Exact size : length * width *height ;
(2)  Wind speed (max speed);
(3)  Snow load (kg/m2 in max situation);
(4)  Earth quake grade (if have) ;
(5)  Live load and dead load for roof and flooring(special for mutli-floors building);
(6)  The requirements for window and door;
(7)   Max height and weight for crane to lift;
(8)   What are the materials for roof and wall ?


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now