Construction Job Site Trailers

Product Details
Customization: Available
Certification: CE, ISO9001, ISO
Customized Or Not: Customized

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2015-01-05
Management System Certification
ISO 9001, ISO 9000, OHSAS/ OHSMS 18001, ISO 14064
  • Construction Job Site Trailers
  • Construction Job Site Trailers
  • Construction Job Site Trailers
  • Construction Job Site Trailers
  • Construction Job Site Trailers
  • Construction Job Site Trailers
Find Similar Products

Basic Info.

Model NO.
kh-ph
Material
Sandwich Panel, Sandwich Panel
Wall Material
PU /EPS/Rock Wool Sandwich Panel
Floor
Vinyl Sheet on Plywood or Cement Board
Window
Aluminum Window, Double Glazing
Door
Aluminum Sandwich Panel
Connection
Screws, Bolts
Insulation
PU or Specially Required
Color
According to Customer
Design
According to Customer or by Ourself
Fire Proof
B Grade
Life Span
More Than 25 Years
Usage
Dormitories, Warehouse, Villa, Temporary Offices, Workshop
Customized
Customized
Transport Package
Load Into 40FT Container with Proper Packing
Specification
ISO
Trademark
K-HOME
Origin
Henan, China
HS Code
94060000
Production Capacity
500PCS/Month

Product Description

Construction Job Site Trailers
 
Product introduction
These Construction Job Site Trailers are designed by our highly skilled designers with advanced techniques. These Prefabricated Site Offices are designed utilizing the optimum quality material, sourced from the licensed sellers of the market. We have already designed Prefabricated Site Offices in many countries,Our Buildings are strong and sturdy in nature and ensure long-lasting service life. Our qualified professionals and rich industrial experience in this domain, we are devotedly engrossed in offering Prefabricated Site Offices that is of great use for facilitating labors and staff of Companies.
* Resistance against water and fire
* Withstand earthquakes and storms
* Excellent resistance against Rust
* Speedy Construction for hill Top
* Easy to shift, perfect for remote area
* No Heavy Foundation material used
Inside Show

Construction Job Site Trailers
Mining Construction Site Staff Accommodation Structure
Construction Job Site Trailers
Construction Job Site Trailers
No.   Width Length Height
1 3K nK 3P 6P 9P
2 4K nK 3P 6P     9P
3 5K nK 3P 6P  
Note : K = 1820mm,  P = 950mm   n: can be customized
Installation Steps
1.Measure the size (inner width 5.46m), put the ground beam by expansion screw.
2.Install the column and floor beam.
3.Install the outside wall panel of the first floor, and Mgo plate and stairs of the second floor.
4.Install the purlin and surrounding beam.
5.Install the doors, windows, and roof panel.
Construction Job Site Trailers
Product Materials
Construction Job Site Trailers
Characters of Light  Steel Structure Cheap Prefab Shelters
1.Easily assemble and disassemble.
2.Conveniently Transport.
3.Simple terrain requirments, can be located in hillsides, hills, grasslands, deserts, riversides.
4.The K-Type prefab house is durable and stable, and also with good thermal insulation performance.
5.Its design can be customized, with exquisite and elegant appearance.
6.Most components of prefab house are completed in the factory, the site assembly is convenient and fast.
Construction Job Site Trailers
Company Profile
Construction Job Site Trailers
Henan K-home Steel Structure Co.,Ltd is located in Xinxiang, Henan Province. It is a self operating private enterprise, established in the year of 2007,registered capital RMB 20 million, cover an area of 100,000.00 square meters with 260 employees. We are engaged in design, project budget, fabrication, installation of steel structure and sandwich panels with second-grade general contracting qualification. Our main products covered sandwich panels, OEM prefab house, container house, construction material, light steel structure house, light steel villa, non-standard design house, steel structure projects, and installation service.
Packing and Delivery
Construction Job Site Trailers
FAQ
1. How to install the houses in the site?
We can offer you three type of insisting on the installation:
1.1 : We can offer you the manual include the photos and drawings, or some videos for help you on the installation. And you will organize the local people to install it. 93% of our clients finished their houses in this way.
1.2: We can send our people to your site to guide your people to install. Or send team people (3-5 people) to your site to install for you. This way is most easy way, but you need to pay their round-way tickets, local food, accommodation, transportation, communication and salary, and also their security on the site. Almost 5% of our clients choose this way. And in the normal we will require the order should be more than 100000USD.
1.3: You can send your people (engineers or the technician) to our company to study the installation details. 2% of our clients choose this way for their orders.
2. The advantage of the prefab house.
2.1 : Recycle using: you can assemble it in the site A, then disassemble and install again in the site B, then site C. In such way, there is no industrial rubbish after you finish the jobs in the site.
2.2 : Low cost. The steel structure is much lower on the cost then the tradition building.
2.3 : Quickly installation. In the normal, 6 skilled persons team can install 150 sq.m house every day.
2.4: safety: the prefab house can resistance 7 grade earthquake, and 100km/H wind.
3. The mainly use of the prefab house:
In the normal it's mainly used as temporary building in the site, such as temporary office, labor accommodation, etc. And in the recent years, the prefab house is largely use in the resettlement housing in some disaster area. In 2008, it played a major role on the resettling the victims after the terrible earthquake on 12th, May, 2008.
4. How to maintain your prefab house?
4.1: First of all, when the prefab house is installed, it's better not to make any other changes, like an expansion, adding partitions or cutting down the walls, or removing screws, and so on.
4.2  : Made the re-paint every 1-2 years after you install it. Such way can increase its service life and keep beautiful.
4.3 : Finally, do not tie the wire to the prefab house, which will lead to the prefab house uneven force and easily cause electric shock accident.
5. How to prepare the foundation for the K style prefab house?
In the normal we will offer you the foundation drawing to prepare the foundation. In the normal the K style house is the strip foundation.
6. How many flooring can the K style prefab house build?
In the normal we will suggest you to do the K style prefab house in 1 floor or 2 floors. And the highest one is 3 floors if you need. And will suggest you not build the house more than 3 floors by K style house. If you want to build the house more than 3 floors you better choose the design of T house design supported by the H shape steel
By the way, if you want to layout the toilet room in the K style prefab house, you'd better made it in the ground floor for the water proofing.
7. The materials option for the thermal insulation:
We have 3 materials for your option:
They are: EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, PU (polyurethane) sandwich panel.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier