• Fast Construction Temporary Housing Solutions for Labor Camp
  • Fast Construction Temporary Housing Solutions for Labor Camp
  • Fast Construction Temporary Housing Solutions for Labor Camp
  • Fast Construction Temporary Housing Solutions for Labor Camp
  • Fast Construction Temporary Housing Solutions for Labor Camp
  • Fast Construction Temporary Housing Solutions for Labor Camp

Fast Construction Temporary Housing Solutions for Labor Camp

After-sales Service: Perfect Service and Installation Guidance
Warranty: 1 Year
Material: Steel Structure
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Camp,School,Office
Certification: ISO, CE, SGS
Customized: Customized
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KH-CH
Wall Material
PU /EPS/Rock Wool Sandwich Panel
Steel Frame
4mm Thickness Steel Pillar 3mm Steel
4mm Thickness Steel Pillar 3mm Steel
50/75/100mm EPS/Rockwool/PU Sandwich Panel
Color
Ral Color
Door
Steel Door/Sandwich Panel Door
Connection
Screws,Bolts
Application
Accomodation, Family House,Holiday House
Transport Package
for Container Shipping
Specification
20ft
Trademark
K-HOME
Origin
Henan, China
HS Code
9406000090
Production Capacity
5000 PCS/Month

Product Description


Fast Construction Temporary Housing Solutions for Labor Camp

Khome can provide dormitory facilities, bathrooms, site offices, kitchens and dining halls, laundry units and drying units to
mining sites, oil and gas sites, roadway.
Fast Construction Temporary Housing Solutions for Labor CampRelocatable accommodation solution for sale

When a new project begins, a rapidly built workforce camp is essential, and it should be flexible, scalable, and economical. K-Home onSite temp housing will be a perfect solution. As a company that promotes the development of modular housing in China and even internationally, K-home is committed to helping more companies solve the housing problem, so when building dormitories, we consider durability, longevity, and weather changes were considered, and sealing, insulation, and even drainage systems were invented. Maximize cost reduction.



Why K-HOME make new design and win more market? As following are our reasons for your thinking about:
 
1. K-HOME unique design, make all parts more modular design. Alll roof and bottom are designed as bolts connection.
Our house size could be 3mx6m and height 2.8m. some even special size are also very easily customerized.
This design make all parts delvery by light weight. You don't need cranes for loading and unloading.
And one 40HQ shipping container could load 10 units. For  installation ,it is also very fast. 4 housrs by 3 people could finish 1 units.
And it no need the cranes if you only make 1 floor building.
 
 
More over, our design let us to supply more small parts to help the house make better sealant, water proof and long life span.
Many many africa market like our design.the modular design help people more easy for maintance for roof and floor.
All are bolts connection, very easy and datachable.

The scope of Labour Accommodation Temporary Construction Facilities supply includes:

1. Galvanized thickened steel frame, solid ground structure, waterproof floor, insulated wall panel and roof system, independent drainage system.
2. Electrical system, including switches, sockets, wires, lights.
3. Provide single or double bed and wardrobe for each dormitory.
4. Double air conditioners.
Portable temporary housing are available in a variety of sizes and configurations, or we can custom design your solution.



Fast Construction Temporary Housing Solutions for Labor Camp
Item  Specification 
 Part 1: Roof System (roof plate + roof purlin + roof insulation + ceiling)
 1  Roof Plate

 Roof tile is 0.5 mm thickness steel sheet;

 Pre-coated and color coated;

 2  Roof Purlin

 1pc 40x80mm Galvanized Square tube
+ 2pcs 40x60mm Galvanized Square tube

+ 5pcs 40x80mm Galvanized Square tube;

 3  Roof Insulation  50 mm glass wool insulation material;
 4

 

 Ceiling

 Ceiling is 0.4 mm thickness shaped steel plate;

Pre-coated and color coated;

 Part 2: Steel Frame (Corner post + column + beam + bolt)
 1  Corner Connection Part

 Material: 4 mm Thickness Shaped Steel, surface spray treated by machine after repeatedly polished;

 Size: 160* 160* 160 mm (Bottom)

&160* 160* 180 mm (Top);

 2  Column

 Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;

 

 Size: 160* 160* 2480mm;

 3  Top and Floor Long Beam

 Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;

 Size 1: 3680* 60* 160 mm;

Size 2: 5680* 60* 160 mm;

 4  Top & Floor Short Beam

 Material: 2.3mm Thickness galvanized steel structure, surface spray treated by machine after repeatedly polished;

 Size 1: 2680* 60* 160 mm;

 5  Bolt

 High strength galvanized steel bolt;

 To fix the Corner Connection Part and beam, Corner Connection Part and column;

 Part 3: Floor System (Floor structure + floor panel + floor leather)+Wall Panel
 1  Floor Purlin

 Material: 10pcs 40x80mm Galvanized Square tube
+4pcs 40x80mm Galvanized Square tube
+2pcs 30x50mm Galvanized Square tube;

 2  Floor Panel

 18 mm MGO board

 3  Wall Panel

 50 mm rock wool sandwich Panel;

 Outside color is light silver gray (0.38mm thickness steel );
 Inside is white color steel (0.38mm thickness steel ).

 Part 4: Drainage system (Top drainage channel + drain pipe)
 1  Water drain pipe  and channel

 Water drain pipe:
 Diameter: 50mm
 Length: 2700mm;
 Water drain channel: 90(W)x50(H)mm;

 Part 5 : Door & window system
 1  Standard Door

 Size 1: 930mm*2000mm
 Material: sandwich panel/steel door;

 2  Window

 Size 1: 930mm*1200mm
 Plastic steel single glass sliding window (including screens) With 0.35mm   Double glass and strength pvc window frame/Glass Window;
 Window rail is smooth.

 Part 6: Electricity System
 1  Lamp

 Type: LED energy saving lamp;
 Power: 24W
 Include: Two sockets and one switch;
 Note: The socket will be equipped according to the local standard.
 Includes: electric wire and conduit;
 Use: The electric wire will be in the conduit and go through the wall panel for concealed installation.

 2  Socket & Switch
 3  Electric Wire
 4  Air Circuit Breaker
 Part 7: Internal Decoration
 1  Internal Corner

 Material: PVC;
 Includes: Vertical internal corner and horizontal internal corner.

 2  Steel Plate for Internal Connection

 Material: Stainless Steel;
 Used on the joints between two bottom frames when different containers connected with each other.

 3  Floor Leather

 Material: PVC
 Thickness: 1.6mm
 Features: moisture proof; wear resisting;
anti-corrosive and thermal insulation.

 Part 8: Installation Accessories
 1  Sealant  Used for the joints of doors and windows for better waterproof.
 2  Structure Adhesive  Used for the reinforcement and seal of the steel frames.
 3  Screws  Include: rivets, bolts, drill tail screw;
 
Keep your people clean in the field with toilet and shower

Specifically designed to meet the needs of dormitory programs at camp, our portable bathroom and shower units are mobile and arranged to accommodate a large workforce to ensure maximum comfort and hygiene.

We at K-home have designed a raised shelf inside, mainly to leave space for water pipes, a set of sewage pipes and drain pipes provides convenience, this toilet can be used as long as it is connected to an external water pipe, we also provide water-saving toilets, shower, sink and urinal etc. Available in a variety of layouts that you can easily use for your construction site.

Fast Construction Temporary Housing Solutions for Labor Camp
Prepare healthy meals for your workforce

Whether man camps need space for a few or thousand of people, we can provide a good plan. Generally, a campsite only needs a simple dining room with a clean kitchen and dining table.

Even in remote areas, you can use our fully equipped commercial kitchens to provide delicious and nutritious meals. Mobile restaurants are available in a variety of layouts.

The scope of supply includes:
1. Anti-slip and waterproof ground system.
2. Safe power system.
3. Stainless Steel Appliances: Stove, Range, Grill, Oven, Reach Cooler and Freezer.


Fast Construction Temporary Housing Solutions for Labor CampConstruction site housing benefits

Reduction in man hours from extended time spent traveling to and from job sites. This allows your crews to be fully rested while decreasing costs on the project.
Workforce turnover is greatly reduced by providing employees with clean, efficient and comfortable housing.
A turnkey facility allows workers to relax and recover after a long day with the comforts of home including a flat screen TV, a microwave, stove and pillow top mattresses.
Travel trailers allow you the flexibility to scale up or down as the project dictates.


Why choose K-Home as your partner

K-Home is the leader of mobile homes supplier in China, we own the advanced technology that promote the develop of the modular product. Now more and more people choose K-Home because of the following:
1.Cost-effective price
K-home is a direct factory, there aren't any middle fees, and there are thousand of container unit delivery to the market, so whatever the order is big or small, you can get a bulk price.

2.Experienced team
K-home has began the prfabricated house business from 1996, there are 25 years experience, and there gather 20 engineers and 100 workers, so our engineer can customized solution, and based on your budget or some other special requirement, we can adjust the design or material to meet your need, it's a pleasure thing to get one building that fully meet the need, right?

3.Independent manufacture system
All the house components, the painting, the cutting are finished by our own manufacture team, on the one hand, we can control the quality of every stage, on the other hand, you can get an bulk price.

4.Consideration service
From the design to installation,K-home will as a partner listen your idea , help you to confirm design, guide the installation, also, we attention small detail, such as every components will be mark for quantity check, the house parts stock suggestions will be send before receive cargo.

Fast Construction Temporary Housing Solutions for Labor Camp
FAQ:
Q: How to install?
A: 1. It's not difficult, because all the parts is modular produced and screw connected structure, so all the parts can be connected
easily and very fast. 
2. We will support you most, now we have a detailed installation manual, and detailed installation guidance video, it will help you
to assemble step by step. And we can help you via online video.
3. Usually 3 skilled worker could assemble 2 units in one day. 
4. In this pandemic period, we help Singapore client completed a worker dormitory; It was their first time to use our container house,
and we can't send our engineer abroad, they completed 80 units in 2 weeks.  
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now