Two-Storey Prefabricated Modular K House Labor Camp Accommodation
The installation of the Prefabricated Temporary On-site Worker Accommodation is convenient, 4-6 people install at least 10K color steel mobile house every day, and the installation speed per capita is about 30 square meters. The color steel galvanized steel structure mobile house has reasonable design, easy disassembly and assembly, can be recycled for many times, has low loss rate and does not produce construction waste.
The average annual use cost is much lower than that of other materials. Moreover, the prefab mobile homes have a long lifespan, and the average service life is at least 15 years. The modular movable room can be disassembled and assembled repeatedly at least 2-3 times during this period, and normal use can be guaranteed after disassembly and assembly. The house adopts standardized components, the length and width are both K (1K=1820mm), which is convenient and quick to install and disassemble. Inserting and bolting on site saves most of the time and greatly shortens the construction period for the project.
The dismountable movable house has no frame or a few frames are welded on site, and then the enclosure structure (color steel sandwich panel) is fixed to the structure. The installation and removal procedures are similar, the steps are reversed, and the operation is very convenient. It is characterized by economy and practicality, many times of movement, simple on-site construction work, low labor cost, and low transportation cost.
During the construction of a large number of permanent buildings, structures, roads and bridges and traffic facilities, and in the future, a large number of prefab temporary housing and supporting facilities are needed. In addition, in industries that require long-term field work and open-air work, temporary houses that meet different requirements are required for emergency needs, disaster relief, travel and festivals.
Therefore, various prefab emergency shelter came into being. With the progress of the times, the improvement of working conditions, and the need to build a harmonious society, the country has high requirements for the safety, applicability and improvement of living conditions of Prefabricated Labor camp.
FAQ?
Q: Are you a factory or trading company?
A: We are a real factory, we have 3 plants in Xinxiang City, Henan Province, China
Q: How about your production capacity?
A: Container House: 1000 sets per month.
Prefab House: 40,000 square meters per week.
Q: How about your quality control?
A: We have got ISO9001:2015 and CE certificate Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.
Q: Is third-party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.
Q: How about your delivery time?
A: Generally within 15 days, it is according to the order quantity, partial shipment is allowed for big orders.
Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do a turnkey job for some kind of project.
Q: How to ensure the product you supply is what we want exactly?
A: Before placing an order, our sales and engineers team will provide you a suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished project photos are available, which will help you understand the solution we provided deeply.