Customization: | Available |
---|---|
Customized Or Not: | Customized |
Fast Installation: | Fast Installation |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Structure Poultry House Prefabricated Construction Peb Metal Farms
Our mission is to provide quality Metal Farms through products to farmers around the world. Since we developed Metal Farms
of new products, we began to provide our customers with durable, attractive farm buildings. From the smallest specialized operations to the largest agribusinesses, we understand your business needs and evolve to meet industry needs.
Industry leaders in Metal Farms and Agricultural Construction belong to us, and you'll experience the benefits of experience at every step of the construction process - even before the walls are raised. Since the value of farm and agricultural buildings is actually in their ability to protect the equipment stored inside, we ensure that each building component is researched and tested to provide exceptional overall building strength in all conditions. We also look for new innovations for your farm to increase productivity and efficiency, such as raised string truss systems designed to accommodate increasing machine sizes; insulation systems to provide a comfortable environment for service equipment; Convenience, and flexibility when building your building.
Whether it's a simple standard building or a hybrid building with a variety of functions, we can provide farm buildings to suit every budget and purpose.
The metal warehouses are the most popular type of pre-engineered building, the main structure consists of pillars, beams, purlins, and crane beam, with some tie bar to connect beam and beam together, or beam and pillar together, to make the whole structure more stable, that could withstand the hazel weather, heavy snow or seismic.
Let's see the steel frame structure in the following
From the picture below, you will see the basic structure in it.
Let's see the full structure of the Pre-Engineered building
How much does it cost to build a steel warehouse?
We can't tell you exactly how much your house will cost until we know your project. But here we will tell you what affects the price of your home.
First of all, the prices of different steel structures and different materials vary greatly. It is difficult for many non-professionals and even professionals to calculate the cost of steel structure workshops. What is the cost of such a steel structure workshop, it is also more complicated, and various costs need to be calculated. Many details are easy to cause negligence and accidental mistakes will occur, so its budget analysis is very important.
Now suppose if you are just making a simple single-layer steel structure, the first one is the material cost. Steel prices are now around $1,000 per ton. Secondly, the cost is related to the height of the span of the steel structure workshop. Basically, no more than 30 meters, which is a regular size. If no crane and the height does not exceed 8 meters, the average steel consumption per square meter will not exceed 35kg.
The second is the price of the enclosure: the enclosure refers to walls, roofs, doors, windows, etc. There is a wide range of materials to choose from, depending on your budget and local climate characteristics. If a single tile is used as the wall and roof.
Then the price of your building is about 50-90 US dollars per square meter.
Is steel warehouse a good investment?
Let's take a look at the advantages of steel structure first, and then you can decide whether it is worth the investment. He has the following characteristics:
1. The steel structure building is light in weight, high in strength, and large in span.
2. The construction period of the steel structure building is short, and the investment cost is correspondingly reduced.
3. The steel structure building is easy to move, and the recycling is pollution-free.
4. Steel structures can better control investment costs, and there are fewer unfinished projects.
Maybe those are the reasons why you can see more and more pre-engineered steel warehouses in the market, no matter big factory or a small storage room, PEB is a good option.
Let's see our previous design below
Main Parts | Item Name | Specification |
Main Steel Frame | Steel Column | Q235B, Q355B H shape, Box, Steel pipe, Hot rolled sheet |
Steel Beam | Q235B, Q345B H shape, Steel Truss, Hot rolled sheet |
|
Supporting System | Brace | Q235B, Q355B Steel rod, Steel pipe, Angle steel |
Roof Purlin | C or Z shape, Steel purlin | |
Wall Purlin | Q235B, Q346B C or Z shape, Steel purlin |
|
Roof | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc., | |
Wall | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc., | |
Accessories | Bolts | Ordinary, High strength |
Gutter | Galvanized Steel plate, Stainless steel | |
Windows | Aluminum alloy-Glass, Aluminum alloy-shutter, PVC | |
Doors | Sliding or Rolling door | |
Downpipes | PVC pipe, Color steel pipe | |
Edge Cover | Made of color steel sheet thickness 0.5mm | |
Ventilator | Stainless steel | |
Crane | Crane in 5 tons to 20 tons |
Let's see the detailed parts of the steel structure house.
Questionnaire
Below issues are needed to make solution.
3.1 Location (where will be built? ) _____country, area
3.2 Size: Length*width*height _____mm*_____mm*_____mm
3.3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
3.4 snow load (max. Snow height)
_____kn/m2, _____mm
3.5 anti-earthquake _____level
3.6 brickwall needed or not If yes, 1.2m high or 1.5m high
3.7 thermal insulation If yes, EPS, fiberglass wool, Rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
3.8 door quantity & size _____units, _____(width)mm*_____(height)mm
3.9 window quanity & size _____units, _____(width)mm*_____(height)mm
3.10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
FAQ
Q1: Can you accept the customized service and personalized design?
A: Yes, our professional engineer team can make a drawing by following customers' requirements.
Q2: How to pay?
A: T/T will be more appreciated.30% deposit before producing,70% balance before loading.
Q3: How to install?
A: We will provide detailed installation videos and instructions to you. Technicians will be sent to help you on-site if necessary. However, the visa fee, tickets, accommodation, food, and wages will be undertaken by buyers.