Brief Introduction of China Portable House/Container Van House Philippines
Spend no more than 1 dollar, your worker will have a luxury place to rest.
The temporary box type steel house is not a new product for most of us, you may see it somewhere. The box type house is a temporary container house, it is pre-manufactured inside the factory, and delivered to your site to make assembling. It greatly reduces outside work and will be much easier on-site work.
We at K-Home have always insisted on serving customers with low prices and high quality. In order to make workers comfortable without making investors spend more time and money, we have developed out a container van house that can be recycled to use, quickly installed, and immediately move in, no need for second-time decoration.
We have cooperated with the largest engineering company in the Philippines. The first order of 100 units was used to construct dormitories for workers. This project uses a standard container, dimensions of 5950*3000*2800mm, the floor has 30 small purlines, so even the worker jumping inside, the floor won't shake, it is very strong.
And we have our special water drainage system, so even in the local rains heavily, the house could performance very good on water drainage.
Here is the picture at sight
How much does container house cost in the Philippines?
The price depends on value, firstly we need to know what is our container van, does it same with other products in the market.
let's see our steel structure details together.
The detail configuration
Inside Show
Item |
Specification |
Part 1 |
Roof System |
I. |
Steel frame |
The steel frame is Q235 galvanized fitting; |
II. |
Roof insulation |
The ceiling is blue color steel pre-coated 0.4mm outside strong steel sheet;
With 75mm glass wool insulation material; |
III. |
Roof ceiling |
The ceiling is shaped PPGI with different pattern |
Part 2 |
Floor System |
I. |
Steel frame |
3mm Galvanized Steel for main structure |
ii. |
Floor |
MGO Board/Cement Board + PVC leather floor |
Part 3 |
Column System |
I. |
Column |
2.5mm Shaped Galvanized Steel |
Part 4 |
Sandwich Wall System |
I. |
Wall Panel |
EPS Foam Sandwich Panel/ Rock Wool/PU Panel;
The outside color is light silver-gray (0.4mm thickness steel );
Inside is white color steel (0.4mm thickness steel ). |
Part 5 |
Door & window system |
I. |
Door |
Material: Steel door
Size: 2000*980mm(H*W) |
II. |
Window |
Material: Aluminum alloy steel double hollow glass sliding window (including screens)
Size:1200*1000mm(H*W) |
Part 6 |
Electric system |
I. |
Electric system |
Includes 2sets ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set,
Electrical box with safety protection device connecting cable for connecting; |
Part 7 |
Accessories |
sories. |
From our configuration, you will see our design is more reasonable, and it can greatly reduce water leak and floor collapse, beam bending problems. We did an upgrade recently, and no one does it in the market.
All those upgrades increase the value of the house, so we can't judge the house from price only, also need to consider the value, the real life span, and the maintenance costs.
If you can't find the difference, contact us freely for further clarification.
How to Assemble the container van step by step?
What is the benefit of using containers house?
1)Rich experience and professional team
With more than 20 years' experience, our employees have been professionally trained and evaluated, we can manufacture strictly according to your drawings and request or design by ourselves to provide you with the most satisfactory solution to you.
2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines, and so on.
3)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshops to carry out the product inspection and reinspection
4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified
5)Prompt Delivery.
Within 25-60 days after the order is confirmed, also depends on the fabrication quantity.
Is it really cheaper to build a container home?
Significantly using container vans for regular homes will be a cheaper solution. Normally it costs at least 30% less than a permanent building. And it is just a temporary house, no need very strict permit for building or installation, and it could greatly reduce your construction period, and labor hours. After completing the complete, you could move in immediately no need to wait for it dry like a permanent building.
And our house shows great rain water proof, windproof, anti-earthquake features, which can satisfy most of ours demands.
Project Show
Delivery Photos
FAQ?
Q: How to buy?
A: You can provide us your drawing, and we will produce as your drawings.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
Q: How to ship?
A: Loading by sea shipping container.
Q: How to install after the goods arriving destination?
A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.