• Light Steel Prefab Houses for Construction Sites
  • Light Steel Prefab Houses for Construction Sites
  • Light Steel Prefab Houses for Construction Sites
  • Light Steel Prefab Houses for Construction Sites
  • Light Steel Prefab Houses for Construction Sites
  • Light Steel Prefab Houses for Construction Sites

Light Steel Prefab Houses for Construction Sites

Material: Sandwich Panel
Usage: Warehouse, Dormitories, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Wall Material: PU /EPS/Rock Wool Sandwich Panel
Steel Frame: 4mm Thickness Steel Pillar 3mm Steel
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KH-PH
Wall Panel
60mm EPS/Rockwool/PU Sandwich Panel
Floor
PVC Flooring Sheet/Laminated Floor PCS
Color
Ral Color
Door
Steel Door/Sandwich Panel Door
Connection
Screws,Bolts
Transport Package
Water Proof
Specification
ISO SGS
Trademark
Khome
Origin
Henan, China
HS Code
7308900000
Production Capacity
5000 PCS/Month

Product Description

 
Light Steel Prefab Houses for Construction Sites

Light Steel Prefab Houses for Construction Sites is low cost housing for site labor are made very precisely by using best material and highly advance technology based machinery, which widely used for temporary construction houses for building, roads, railways and other field operations, as well as urban municipal, commercial and other temporary housing. Generally, prefab sandwich panel T-type prefab house is divided in three kinds of design, includes single slope, double slope, and four slope .

Light Steel Prefab Houses for Construction Sites
Technical Parameter of standard Prefabricated Building:
1. Wind resistance: Grade 11(wind speed≤111.5km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.5kn/m2
3. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
4. First floor load capacity: 150 kg/m2
5. Live load of corridor is 2.0kn/ m2
6. Four skilled workers can finish installation of 100sqm in 8 hours for the light steel structure.
7. Most components of the house are recycled, so the shelf life is over 20 years without any building garbage.
8. We can design and produce the house according to customer's request.
9. We can provide the service of installation, supervision and training by extra.Light Steel Prefab Houses for Construction Sites
No. Parts Name Materials and Details
1 Ground Beam C steel/80*35
2 Steel Column Double C steel/80*35
3 Steel Beam C steel/80*35+ C steel/50*30
4 Ring beam C steel/80*35
5 Floor Purlin C steel/80*35
6 Roof Purlin T steel/40*40
7 Lateral Brace T steel/40*40
8 Tie Rod/Bar ring steel
9 Canopy frame L steel/40*40
10 External Wall A:EPS sandwich panel
B:PU Sandwich Panel
C:Glass wool sandwich panel
11 Internal Wall A:EPS sandwich panel
B:PU Sandwich Panel
C:Glass wool sandwich panel
12 Roof panel A:EPS sandwich panel
B:PU Sandwich Panel
C:Glass wool sandwich panel
13 Window 5mm glass PVC sliding window
14 Door steel frame with sandwich panel door
15 Stair steel stair
16 Aisle board 3mm pattern-steel plate
17 Rail corridor square tube/30*30
18 Floor bearing panel 15mm PLY-wood board

Light Steel Prefab Houses for Construction Sites

Light Steel Prefab Houses for Construction Sites
Light Steel Prefab Houses for Construction Sites
Light Steel Prefab Houses for Construction Sites
Light Steel Prefab Houses for Construction Sites
Light Steel Prefab Houses for Construction Sites
Q1. What products do you offer?
A1.  We focus on prefabricated houses, such as labor camp, container house, steel structure warehouse, modular villa for more than 12years.
 
Q2. What is your payment term?
A2. Our payment term : for standard products 30% deposite, the banlance should be paid before delivery. for Customized products, will depend on the design.
 
Q3. What is your MOQ (minimum order quantity) ?
A3. for standard products, we don't have MOQ quantity.
 
Q4. How is your after-sales service?
A4. 1. 24 hours available after-sales service.
       2. For the installation, we will offer installation drawing and videos, if any questions we can reply in time. We can also can send our engineer to guide local workers, but you have to charge the double ticket, accommodation, food and salary.
 
Q5. What information should we offer before you quote?
A5. 1.you have the drawing, pls give us and tell us the material you use.
       2. If no drawing, pls tell us the usage and the size of the house, then we design for you with the good price.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now